        Repurposing a Spent Nuclear Fuel Cask for Disposal of Solid Intermediate Level Radioactive Waste From Decommissioning of a Nuclear Power Plant in Korea

        Wonjune Mah,Chang-Lak Kim 한국방사성폐기물학회 2022 방사성폐기물학회지 Vol.20 No.3

        Operating and decommissioning nuclear power plants generates radioactive waste. This radioactive waste can be categorized into several different levels, for example, low, intermediate, and high, according to the regulations. Currently, low and intermediate-level waste are stored in conventional 200-liter drums to be disposed. However, in Korea, the disposal of intermediate-level radioactive waste is virtually impossible as there are no available facilities. Furthermore, large-sized intermediate- level radioactive waste, such as reactor internals from decommissioning, need to be segmented into smaller sizes so they can be adequately stored in the conventional drums. This segmentation process requires additional costs and also produces secondary waste. Therefore, this paper suggests repurposing the no-longer-used spent nuclear fuel casks. The casks are larger in size than the conventional drums, thus requiring less segmentation of waste. Furthermore, the safety requirements of the spent nuclear fuel casks are severer than those of the drums. Hence, repurposed spent nuclear fuel casks could better address potential risks such as dropping, submerging, or a fire. In addition, the spent nuclear fuel casks need to be disposed in compliance with the regulations for low level radioactive waste. This cost may be avoided by repurposing the casks.

      • Decay Heat Estimation of Spent Fuel Assemblies for Decommissioning of Kori Units 3 and 4

        Wonjune Mah,Chang-Lak Kim,Sun-kee Lee 한국방사성폐기물학회 2022 한국방사성폐기물학회 학술논문요약집 Vol.20 No.2

        This paper mainly focuses on the maximum decay heat estimation generated from spent fuel assemblies in the spent fuel pool of Kori units 3&4 at the beginning decommissioning. It is assumed that the spent fuel pool is fully occupied with 2,260 spent fuel assemblies, same as its design capacity. In addition, equally 56.5 spent fuel assemblies have been generated per year. The minimum cooling time is five years considering the transition phase between the permanent shutdown and the amendment of Operating License for decommissioning. Sending and receiving of spent fuel assemblies to/from other units are neglected. Seven representative spent fuel assembly groups are established based on the burnup rate and cooling time. Conservatively high values for the burnup rates and low values for the cooling times are applied. Calculation of the decay heat of each representative group has been performed by using ORIGEN decay solver of SCALE. Then, total decay heat has been calculated based on this. Group 1, 2, and 3 contain comparatively old spent fuel assemblies with 45 GWd/tU burnup rate and 20~30 cooling years. The calculation shows 489~586 watts of decay heat per assembly. Group 4, 5, 6, and 7 contain comparatively new spent fuel assemblies with 55 GWd/tU burnup rate and 5~20 cooling years. The calculation shows 741~1,483 watts of decay heat per assembly. The total maximum decay heat therefore is estimated as 1,609,459 watts.