http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
발전설비계획과 송전설비계획을 연계한 통합설비계획에 관한 연구
金發鎬,韓錫萬 弘益大學校 科學技術硏究所 2005 科學技術硏究論文集 Vol.16 No.-
The competitive electricity market requires a new paradigm in the capacity planning. Market participants operate their facilities and plan new capacities for the benefit maximizing. However, the public system planner should provide the national guideline, because the power system is costly & large item. This paper presents a methodology on a generation expansion planning incorporating the transmission expansion planning as a public policy. The proposed model is formulated as a mixed integer programming that minimized operation and construction costs. This model is demonstrate by a case study.