http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
Parameter Estimation and Confidence Limits for the Log-Gumbel Distribution
허준행,Heo, Jun Haeng Korean Society of Civil Engeneers 1993 대한토목학회논문집 Vol.13 No.4
본 연구에서는 기존의 대수(對數)형태인 대수(對數)-Gumbel 확률분포함수를 변환하여 새로운 형태의 대수(對數)-Gumbel 확률분포함수를 정립하였다. 이 분포함수를 이용하여 모멘트법, 최우도법, 확률가중모멘트법(Probability weighted moments)에 기초한 매개변수 추정과정을 유도하였으며, 또한 재현기간별 신뢰한계를 구하기 위하여 각각의 매개변수 추정법에 대한 점근분산식(漸近分散式)을 유도하였다. 아울러 유도된 식들을 실제 자료에 적용하였다. The log-Gumbel distribution in real space is defined by transforming the conventional log-Gumbel distribution in log space. For this model, the parameter estimation techniques are applied based on the methods of moments, maximum likelihood and probability weighted moments. The asymptotic variances of estimator of the quantiles for each estimation method are derived to find the confidence limits for a given return period. Finally, the log-Gumbel model is applied to actual flood data to estimate the parameters, quantiles and confidence limits.
허준행,송재우,이길춘,Heo, Jun-Haeng,Song, Jae-U,Lee, Gil-Chun 한국수자원학회 1983 물과 미래(한국수자원학회지) Vol.16 No.2
오늘날 인구증가와 공업화, 도시화 및 수질오염등에 따라 용수수요가 급격히 증가하게 되었다. 본 연구에서는 목표연도인 2001년까지 5개권역에 대한 용수 수요량과 가용수자원량을 비교분석하여 적용확보 방안을 제시하였다. 본 연구를 통하여 얻어진 결과는 아래와 같다. 1) 월별 용수증가추세에 대응하여 지표수와 지하수로 공급함을 원칙으로 하되, 부족량에 대해서는 댐 공급량으로써 보충키로 한다. 또한 소요공급량은 공급에 앞서 완전 확보토록 하여야 한다. 2) 각 권역에서 월별 계절별 최대물부족량은 6월과 하계에 발생한다. 3) 물부족량이 댐 공급량을 초과하게 될 시기는 III권역에서 1984∼1990년 및 1994∼2001년이다. 4) III권역의 물부족량을 확보하기 위하여 영산강 유역의 마산 금호만하구언 완공년도를 2001년에서 1991년으로 앞당겨야 할 것이며, 섬진강 유역에서는 주암댐의 완공년도를 1991년에서 1986년으로 앞당기고 1986년까지는 유역변경에 의하여 섬진강 유역에서 물을 공급 받으면서 지하수 및 소규모 저수지 개발을 행하여야 할 것이다. The water demand has been rapidly increased by the growth of population, industrialization, unbanization, water pollution and so on. This study carried out the seasonal pre-reserved planning for the five zones, comparing the water demand with the available water resources up to the goal year, 2001. The results of this study are as follows; 1) It is principle that the monthly water demand is supplied by the surface and ground water as the increasing tendency of it, and the deficit of water is supplemented by the water supplying capacity of dam. And water demand should be completely reserved before supplying the deficit of water. 2) The monthly and seasonal maximum deficit of water demand take place in June and summer. 3) The periods when the deficit of water demand exceeds the water supplying capacity of dam are 1984-1990, 1994-2001 in zone III. 4) To reserve the deficit of water demand in zone III, we would like to pre-construct Masan-Keumbo estuary barrage from 2001 to 1991 in Seomjin river basin, the deficit of water demand is supplied by the diversion of water from Yeongsan river basin with the developments of the ground water and small reservoirs until 1986.
Parameter Estimation and Confidence Limits for the WeibulI Distribution
허준행,Heo, Jun Haeng Korean Society of Civil Engeneers 1993 대한토목학회논문집 Vol.13 No.4
본 연구에서는 Weibull 확률분포함수의 매개변수 추정방법을 적용하였으며, 재현기간별 신뢰한계를 구하기 위한 점근분산식(漸近分散式)을 유도하였다. 각 과정은 기존의 모멘트법, 최우도법, 확률가중 모멘트법(Probability weighted moments)개념에 기초하여 유도하였으며, 유도된 식들을 실제 홍수자료에 적용하였다. For the three parameter Weibull distribution, the parameter estimation techniques are applied and the asymptotic variances of the quantile to obtain the confidence limits for a given return period are derived. Three estimation techniques are used for these purposes: the methods of moments, maximum likelihood and probability weighted moments. The three parameter Weibull distribution as a flood frequency model is applied to actual flood data.