RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • KCI우수등재

        야산 기계화 개간공법에 관한 연구 -레이크 도저의 적정 이빨 간격의 선택과 발배근작업능률 시험(제1보)-

        류한열,정하우박승우 한국농공학회 1975 한국농공학회논문집 Vol.17 No.3

        This experiment was carried out to establish the mechanized methods in stumping and root-clearing, which were the most important works in the reclamation of sloping uplands. The determination of optimum teeth interval of rake blades and its operation methods to reduce the quantity of transported topsoil during the works, are the aims of this investigation. A newly designed rake blade, whose net teeth intervals could be regulated by three stages as 15cm, 25cm, and 35cm, was manufactured to attach to the bulldozer of 13ton. The experiments were carried out at Kilsang-Myon, Kwangwha-Gun, from Aug. 9 to Aug. 23, 1975. For each interval, 36 test plots of 50${\times}$10mn in size, which were regulated under three levels of land slopes of 10, 20, and 30% and two different tree stand density of high or medium values, were randomly chosen and arranged by two-replicated split-split plot design. Each stump classified by its diameter was stumped and cleared by the rake dozer to be related between diameter and stumping time. The results obtained in this experiment can be summarized as follows: 1. Stumping times for the diameters ranging from 6 to 18cm of stumps are almost the same and they are not varied by the difference of teeth intervals of rake dozer. 2. By back-ward stumping method, the number of stumps which can be stumped per hour ranges almost from 100 to 170, showing significant difference with respect to the teeth intervals. The working area is sharply varied with not only the stand density of stumps but the teeth intervals. 3. Optimum stumping distance for each teeth interval of rake dozer to minimize the quantity of transported topsoil are varied with such the rates as it is 15m or 20m for 15cm of teeth interval, but 25m for 25cm or 35cm, respectively. The clearing distance could be chosen almost double as long as the operating distance. 4. The working areas per hour of the simultaneous stumping and clearing methods are no significant difference among the various treatments of working conditions, but they are affected by the operating techniques. However, the influencing factors of the working conditions as classified before and the working directions are ranged from 10 to 15 per cent of total working area, respectively. 5. The residual rates of stumps which are not stumped by the rake dozer in each test plot are generally reduced as the teeth interval gets narrower, but there are no significant difference among them. The mean residual rates average to be about 4% for the simultaneous stumping and clearing method. The back-ward stumping method are recommended to be supervised and directed by more than one man, to show the operator where the stumps are located. 6. The results according to the stumping and clearing methods are summarized as Table IV-2. And the selection of working methods is recommended to follow as shown in Fig. IV-9 with respect to the stand density of the field. 7. Generally speaking, the narrower the teeth interval, the better become the working results, but the more the quantity of transported topsoil is increased. Therefore, it is recommended that the teeth interval should be reduced from the present distance of more than 30cm to 25cm or 15cm, by developing suitable working methods through more field works and experiments.

      • KCI우수등재

        야산 기계화개간 공법에 관한 연구(II) -개간공사에 있어서 인력작업의 특성분석-

        류한열,정하우박승우 한국농공학회 1975 한국농공학회논문집 Vol.17 No.4

        In order primarily to establish the working stages in the reclamation works and to- analyze the working characteristics of man-power, the investigations for construction_ works were conducted on Echeon Largescale Reclamation Project Area. The results are summarized as follows; 1. The working chart on reclamation by man-power is Fig.IV-1. 2. The. ratio of actual working time to total varied with the total times, being 1.0 for less than 4 hours but about 0.9-0.83 for more than 5 hours. 3. Felling operations can be classified into three stages as truck-cutting, branch- cutting, and binding-up, of which results are in Table IV-2. The larger the diameter of stands, the more times for both the cutting operations are, but the moving time is constant to be about 15 sec. 4. Stumping and clearing works have the results prepared in Table IV-3. Between the stumping time and the diameter of stands d, there show highly significant positive correlations, expressed as t=2.212d -4.792. The more the ratio of small diameters to total, the more hastily the total hourly working results of each person are increased. 5. Working results for constructing drainage facilities and ridges are in Table IV-5. The labours for placing patches of grass are required more than twice or three times as much as those are showed in the established standards, and such the different results imply more investigation to be necessary. 6. Table IV-6 sholvs the results for plowing andh arrowing, that are less amount thant the standards. Therefore, more inverestigation should be prepared.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼