http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
이경배(G. B. Lee),이은웅(E. W. Lee) 한국유체기계학회 2005 유체기계 연구개발 발표회 논문집 Vol.- No.-
We have studied the prearranged plan and the economy of a candidate site for the development of small hydro power. And also we have confirmed its economy by suggesting the technology of the unmanned operation and the selection of the water turbine generator which has a great efficiency, working rate and suitability to the topographical characteristics of various development sites, for example, irrigation reservoirs, water works pipes, sewage systems and cooling water of a steam power station. We proposed some opinions such as the better improvement of small hydropower industry the people'view, cooperation among industry/university/research institutes, remote control/maintenance and goverment's legislature and supporting system etc.