http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
朴成白 진주교육대학교 1979 論文集 Vol.18 No.1
This paper is to study the motion in Tube Vulcanizer Process of S Company. This study has been designed with the following objectives: (1) to analyze the minute motion of each parts in job. (2) to examine the simplification, sequence change and rationalization of job, according to the factiors which is comoosed of its job, (3) to investigate talc beat method for the job performance. (4) ultimately, to improve the quality and to increase the production by reducing tee job time, utilizing the machinery tools effectively, shortening the degree of fatigue. In the motion study of this paper, three jobs are classified, that is, the job which puts a tube in vulcanizer, the job which puts a the out vulcanizer and the job which fill a tube with air. They are recorded arid analyzed by Therblig Symbol of 3 motions which are ① walking ② transportation ③ pressing. By so doing, this paper found out the unreasonable motion of job and clarified the points of improvement. Besides this, in this paper, the period of time in skill mastery is classified by 4 stages: not more than 3 months: 3 months: 6 months: 9 months. These stagers are investigated and compared with in the process of skill mastery. And in the point of management view, this paper clarified the solution of problems in production coordination and the reliability of employee's skill.
勤勞者의 作業動作에 관한 硏究 : Tube 工業을 中心으로 with special reference to tube industry
朴成白 진주교육대학교 1980 論文集 Vol.20 No.1
This paper is to study the motion in Tube Vulcanizer Process of S Company. This study has been designed with the following objectives: (1) to analyze the minute motion of encl parts in job. (2) to examine the simplification, sequence change and rationalization of job, according to the factors which is composed of its job. (3) to investigate the best method for the job performance. (4) ultimately, to improve the quality and to increase the production by reducing the job time, utilizing the machinery tools effectively, shortening the degree of fatigue. In the motion study of this paper, three jobs are classified, that is, the job which puts a tube in vulcanizer, the job which puts a tube out vulcanizer and the job which fill a tube with air. They arc recorded and analyzed by Therblig Symbol of 3 motions which are ① walking ② transporation ③ pressing. By so doing, this paper found out the unreasonable motion of job and clarified the points of improvement. Besides this, in this paper, the period of time in skill mastery is classified by 4 stages: not more than 3 months; 3 months; 6 months; 9 months. These stages are investigated and compared with in the process of skill mastery. And in the point of management view, this paper clarified the solution of problems in production coordination and the reliability o employee's skill.