http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
한국형 고속전철 추진성능 검증을 위한 추진시스템 통합시험
류홍제(H.J. Ryoo),김종수(J.S. Kim),김용주(Y.J. Kim),노애숙(A.S. Knoh),정은성(E.S. Jung),최종묵(J.M. Choi) 전력전자학회 2003 전력전자학술대회 논문집 Vol.2003 No.7(2)
This paper introduces the combined test results of the traction system for KHST(Korean High Speed Train. hereafter refer to KHST) The main purpose of this combined test is to verifythe performance of the traction system that is designed to operate up to maximum 350km/h speed. Combined test system consists of a traction transformer, two AC-DC PWM converters, a PWM Inverter, two traction motors and flywheel system Flywheel system represents equivalent model of the tram inertia Also traction control system and MASCON Interfaces are included<br/> Various kinds of experiments are performed to prove total traction system performance and detail waveforms are described<br/>