    오피스빌딩의 노후화와 유지관리비의 상관관계 분석 = 시설유지관리비를 중심으로

    한글로보기
    • 내보내기
    • 내책장담기
    • 공유하기
      • URL 복사
    • 오류접수
    인용문이 복사되었습니다.

    부가정보

    다국어 초록 (Multilingual Abstract) kakao i 다국어 번역

    The function and efficiency of buildings normally deteriorate over time. An exact timeline of office building design, construction, and repair can be produced if the correlation between deterioration degree and management cost of building is examined closely. This in turn may be use in facility management cost planning. According to the data on office building deterioration degree and management cost, a correlation exists between the sum of outsourcing cost and utility cost.
    The analysis data suggests that the annual outsourcing cost of the initial year is 18,296 won/㎡; this increases by 16.443 won/㎡ over each additional month. The total utility cost for the initial year is 12,997 won/㎡; this increases by 14.034 won/㎡ over each additional month. The total facility management cost for the initial year is 33,023 won/㎡; this increases by 36.151 won/㎡ over each additional month.
    The research shows that there is no correlation between other repair costs and consumption costs. It confirms that the facility management cost is a very important factor that takes up 76.2% of the total building life cycle costs. Nevertheless, compared with other fields of study, the research leaves much to be desired in this area. Further research should be carried out to build on the points raised in this study.
    번역하기

    The function and efficiency of buildings normally deteriorate over time. An exact timeline of office building design, construction, and repair can be produced if the correlation between deterioration degree and management cost of building is examined ...

    The function and efficiency of buildings normally deteriorate over time. An exact timeline of office building design, construction, and repair can be produced if the correlation between deterioration degree and management cost of building is examined closely. This in turn may be use in facility management cost planning. According to the data on office building deterioration degree and management cost, a correlation exists between the sum of outsourcing cost and utility cost.
    The analysis data suggests that the annual outsourcing cost of the initial year is 18,296 won/㎡; this increases by 16.443 won/㎡ over each additional month. The total utility cost for the initial year is 12,997 won/㎡; this increases by 14.034 won/㎡ over each additional month. The total facility management cost for the initial year is 33,023 won/㎡; this increases by 36.151 won/㎡ over each additional month.
    The research shows that there is no correlation between other repair costs and consumption costs. It confirms that the facility management cost is a very important factor that takes up 76.2% of the total building life cycle costs. Nevertheless, compared with other fields of study, the research leaves much to be desired in this area. Further research should be carried out to build on the points raised in this study.

    더보기

    목차 (Table of Contents)

    • Abstract
    • 1. 서론
    • 2. 오피스빌딩에 관한 이론적 고찰
    • 3. 유지관리비 특성 분석 및 결과에 대한 논의
    • 4. 결론
    • Abstract
    • 1. 서론
    • 2. 오피스빌딩에 관한 이론적 고찰
    • 3. 유지관리비 특성 분석 및 결과에 대한 논의
    • 4. 결론
    • 참고문헌
    더보기

    동일학술지(권/호) 다른 논문

    분석정보

    View

    상세정보조회

    0

    Usage

    원문다운로드

    0

    대출신청

    0

    복사신청

    0

    EDDS신청

    0

    동일 주제 내 활용도 TOP

    더보기

    주제

    연도별 연구동향

    연도별 활용동향

    연관논문

    연구자 네트워크맵

    공동연구자 (7)

    유사연구자 (20) 활용도상위20명

    이 자료와 함께 이용한 RISS 자료

    나만을 위한 추천자료

    해외이동버튼