RISS 학술연구정보서비스

검색

인기 검색어

    다국어 입력

    http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

    변환된 중국어를 복사하여 사용하시면 됩니다.

    예시)
    • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
    • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
    닫기
    KCI등재 SCOPUS

    PMO 역량에 따른 프로젝트 성과에 관한 연구 = An Exploratory Study on the Project Performance by PMO Capability

    한글로보기

    https://www.riss.kr/link?id=A105759313

    • 0

      상세조회
    • 0

      다운로드
    서지정보 열기
    • 내보내기
    • 내책장담기
    • 공유하기
    • 오류접수

    부가정보

    다국어 초록 (Multilingual Abstract) kakao i 다국어 번역

    In recent years, although numbers of corporations are bringing in PMO, they seem to be indifferent to PMO performance measurement. This demonstrates that there are also other reasons beside performance measurement of information systems (IS) project being ambiguous by introducing PMO; the lack of acknowledging the concrete function of PMO, and the scarcity of empirical study about the effect of PMO on the project members and project performance. In this sense, this study is aimed at proposing a new research model in which project success factors (i.e., standardization, management advocacy, and staff expertise) affect PMO capability (i.e., knowledge management, resources management, and problem solving competency) positively, leading to project performance (i.e., task outcomes, psychological outcomes, and organizational outcomes) eventually. To empirically test the research model, data are surveyed from PMO department and IS department. To prove the validity of the proposed research model, PLS analysis is applied with valid 132 questionnaires. By employing PLS technique, the measurement reliability and validity of research variables are tested and the path analysis is conducted to do the hypothesis testing. The path analysis results can be organized into 7 ways in large scale. First, standardization of project success factors has a positive association with knowledge management, resources management, and problem solving competency of PMO capabilities. The findings of this result indicate that the multiple or single project management should satisfy standardization in order to operate an effective PMO. Second, management advocacy of project success factors has a positive association with knowledge management, resources management, and problem solving competency. Management advocacy refers to the willingness of management to provide the required resources and authority for project success. There is agreement among researchers regarding the importance of management advocacy for favorable PMO capability. Third, staff expertise of project success factors has a positive association with knowledge management, resources management, and problem solving competency. The findings of this result indicate that the formation of an exceptional consultant or members with a proficient knowledge for staff expertise of project member is the key factor to elevate the PMO capability. Past research suggests that experience and knowledge and the resultant familiarity with the problem faced can be an important determinant of PMO capability. A capable project with appropriate staff expertise means that it enjoys a diversity of abilities and experiences. Fourth, knowledge management competency of PMO capabilities has a positive impact on psychological outcomes but has no direct effect on task outcomes and organizational outcomes. In domestic case of S. Korea, PMO was finally introduced to many other corporations in 2005 though it started bringing in 2000. Therefore, it had neither a significant impact on the task outcomes nor organizational outcomes by lacking the contents and the infrastructure of the knowledge management because the knowledge consolidation and management period of PMO is comparatively shorter by terms than other foreign nations. Fifth, resources management competency of PMO capabilities has a positive association with task outcomes, psychological outcomes, and organizational outcomes. In addition, problem solving competency of PMO capabilities has a positive association with task outcomes, psychological outcomes, and organizational outcomes. Therefore, the findings of this results stress that PMO capabilities has a positive impact on project performance. Sixth, according to the path analysis of the hypothesis, which suggested in this research, problem solving competency is the PMO capability which is the key success factor for task, psychological, and organizational outcomes as an integrated performance model. Further, the analysis rev
    번역하기

    In recent years, although numbers of corporations are bringing in PMO, they seem to be indifferent to PMO performance measurement. This demonstrates that there are also other reasons beside performance measurement of information systems (IS) project b...

    In recent years, although numbers of corporations are bringing in PMO, they seem to be indifferent to PMO performance measurement. This demonstrates that there are also other reasons beside performance measurement of information systems (IS) project being ambiguous by introducing PMO; the lack of acknowledging the concrete function of PMO, and the scarcity of empirical study about the effect of PMO on the project members and project performance. In this sense, this study is aimed at proposing a new research model in which project success factors (i.e., standardization, management advocacy, and staff expertise) affect PMO capability (i.e., knowledge management, resources management, and problem solving competency) positively, leading to project performance (i.e., task outcomes, psychological outcomes, and organizational outcomes) eventually. To empirically test the research model, data are surveyed from PMO department and IS department. To prove the validity of the proposed research model, PLS analysis is applied with valid 132 questionnaires. By employing PLS technique, the measurement reliability and validity of research variables are tested and the path analysis is conducted to do the hypothesis testing. The path analysis results can be organized into 7 ways in large scale. First, standardization of project success factors has a positive association with knowledge management, resources management, and problem solving competency of PMO capabilities. The findings of this result indicate that the multiple or single project management should satisfy standardization in order to operate an effective PMO. Second, management advocacy of project success factors has a positive association with knowledge management, resources management, and problem solving competency. Management advocacy refers to the willingness of management to provide the required resources and authority for project success. There is agreement among researchers regarding the importance of management advocacy for favorable PMO capability. Third, staff expertise of project success factors has a positive association with knowledge management, resources management, and problem solving competency. The findings of this result indicate that the formation of an exceptional consultant or members with a proficient knowledge for staff expertise of project member is the key factor to elevate the PMO capability. Past research suggests that experience and knowledge and the resultant familiarity with the problem faced can be an important determinant of PMO capability. A capable project with appropriate staff expertise means that it enjoys a diversity of abilities and experiences. Fourth, knowledge management competency of PMO capabilities has a positive impact on psychological outcomes but has no direct effect on task outcomes and organizational outcomes. In domestic case of S. Korea, PMO was finally introduced to many other corporations in 2005 though it started bringing in 2000. Therefore, it had neither a significant impact on the task outcomes nor organizational outcomes by lacking the contents and the infrastructure of the knowledge management because the knowledge consolidation and management period of PMO is comparatively shorter by terms than other foreign nations. Fifth, resources management competency of PMO capabilities has a positive association with task outcomes, psychological outcomes, and organizational outcomes. In addition, problem solving competency of PMO capabilities has a positive association with task outcomes, psychological outcomes, and organizational outcomes. Therefore, the findings of this results stress that PMO capabilities has a positive impact on project performance. Sixth, according to the path analysis of the hypothesis, which suggested in this research, problem solving competency is the PMO capability which is the key success factor for task, psychological, and organizational outcomes as an integrated performance model. Further, the analysis rev

    더보기

    참고문헌 (Reference)

    1 구본재, "경영혁신을 위한 IT 거버넌스" 네모북스 2006

    2 Igbaria, M., "Work experiences, job involvement, and quality of work life among information systems personnel" 18 (18): 175-201, 1994

    3 Hackman, J.R., "Work Redesign" Addison Wesley 1980

    4 Rai, A., "The effects of development process modeling and task uncertainty on development quality performance" 37 (37): 335-346, 2000

    5 Chin, W.W., "The Partial Least Squares Approach to Structural Equation Modeling" Lawrence Erlbaum Associates 295-336, 1998

    6 Barclay, D., "The Partial Least Squares (PLS) Approach to Causal Modeling, Personal Computer Adoption and Use as an Illustration" 2 (2): 285-324, 1995

    7 Frame, J.D., "The New Project Management: Tools for an Age of Rapid Change, Corporate Reengineering, and Other Business Realities, Jossey-Bass"

    8 Baccarini, D., "The Logical Framework Method for Defining Project Success" 30 (30): 25-32, 1999

    9 BIA(Business Improvement Architects), "The Impact of Implementing a Project Management Office-Report on the Results of the On-Line Survey" Research Report 2-5, 2005

    10 Todd, P.A., "The Evolution of IS Job Skills: A Content Analysis of IS Job Advertisements from 1970 to 1990" 19 (19): 1-27, 1995

    1 구본재, "경영혁신을 위한 IT 거버넌스" 네모북스 2006

    2 Igbaria, M., "Work experiences, job involvement, and quality of work life among information systems personnel" 18 (18): 175-201, 1994

    3 Hackman, J.R., "Work Redesign" Addison Wesley 1980

    4 Rai, A., "The effects of development process modeling and task uncertainty on development quality performance" 37 (37): 335-346, 2000

    5 Chin, W.W., "The Partial Least Squares Approach to Structural Equation Modeling" Lawrence Erlbaum Associates 295-336, 1998

    6 Barclay, D., "The Partial Least Squares (PLS) Approach to Causal Modeling, Personal Computer Adoption and Use as an Illustration" 2 (2): 285-324, 1995

    7 Frame, J.D., "The New Project Management: Tools for an Age of Rapid Change, Corporate Reengineering, and Other Business Realities, Jossey-Bass"

    8 Baccarini, D., "The Logical Framework Method for Defining Project Success" 30 (30): 25-32, 1999

    9 BIA(Business Improvement Architects), "The Impact of Implementing a Project Management Office-Report on the Results of the On-Line Survey" Research Report 2-5, 2005

    10 Todd, P.A., "The Evolution of IS Job Skills: A Content Analysis of IS Job Advertisements from 1970 to 1990" 19 (19): 1-27, 1995

    11 Cooprider, J.G,, "Technology-Process Fit: Perspectives on Achieving Prototyping Effectiveness" 7 (7): 67-88, 1991

    12 Stelzer, D., "Success Factors of Organizational Change in Software Process Improvement" 4 : 227-250, 1998

    13 "Standish Group International, The Standish Report, The Standish Group International, Inc., 2006"

    14 Nidumolu, S.R., "Standardization, Requi- rements Uncertainty and Software Project Performance" 31 (31): 135-150, 1996

    15 Deephouse, C., "Software processes and project performance" 12 (12): 187-205, 1996

    16 Jurison, J., "Software Project Management: The Manager’s View" 2 (2): 2-57, 1999

    17 Haley, T.J., "Software Process Improvement at Raytheon" 13 (13): 33-41, 1996

    18 Humphrey, W., "Software Process Improvement at Hughes Aircraft" 8 : 11-23, 1991

    19 Wold, H., "Soft Modeling: the Basic Design and Some Extensions, in System Under Indirect Observations: Part 2, Amsterdam North-Holland: K.G. Joreskog and H. Wold(eds)"

    20 Ravichandran, T., "Quality Management in Systems Development: An Organizational System Perspective" 24 (24): 381-415, 2000

    21 Elliot, C., "Qualities of a Data Processing Manager" 13 (13): 35-37, 1975

    22 Atkinson, R., "Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria" 17 (17): 337-342, 1999

    23 Desouza, K.C., "Project management offices: A case of knowledge-based archetypes" 26 (26): 414-423, 2006

    24 Pinto, J.K., "Project Success: Definitions and Measurement Techniques" 19 (19): 53-58, 1988

    25 Ward, L., "Project Management Terms: A Working Glossary, 2nd Edition, ESI International" 2000

    26 Kenrick, D.T., "Profiting from controversy: Lessons from the person-situation debate" 43 (43): 23-34, 1988

    27 Anthony, R.N., "Planning and Control Systems: A Framework for Analysis" Harvard University Press 1965

    28 PMI, "Organizational project management maturity model (OPM3): knowledge foundation, Newton Square" Project Management Institute 2003

    29 Yoo, Y.J., "Media and Group Cohesion: Relative Influences on Social Presence, Task Participation, and Group Consensus" 25 (25): 371-390, 2001

    30 Miller, J., "Measuring the Effectiveness of Computer-based Information Systems in the Financial Services Sector" 11 (11): 107-124, 1987

    31 Henderson, J.C., "Managing I/S design teams: A control theories perspective" 38 (38): 757-777, 1992

    32 Karlsen, J.T., "Management roles for successful IT projects" 8 (8): 7-13, 2002

    33 Chin, W.W., "Issues and Opinion on Structural Equation Modeling" 22 (22): 7-16, 1998

    34 DeLone, W.H., "Information systems success: The quest for the dependent variable" 3 (3): 60-95, 1992

    35 Kerzner, H., "In Search of Excellence in Project Management" 38 (38): 30-40, 1987

    36 Bates, W., "Improving Project Management" 30 (30): 42-43, 1998

    37 Wateridge, J., "IT Projects: A Basis for Success" 13 (13): 169-172, 1995

    38 ITGI(IT Governance Institute), "IT Governance Global Status Report, IT Governance Institute"

    39 Hill, G.M., "Evolving the Project Management Office: A Competency Continuum" 21 (21): 45-51, 2004

    40 Fornell, C., "Evaluating Structural Equation Models with Unob- servable Variables and Measurement Error" 18 (18): 39-50, 1981

    41 Nelson, R.R., "Educational Needs as Perceived by IS and End-User Personnel: A Survey of Knowledge and Skill Requirements" 15 (15): 503-525, 1991

    42 Lee, D., "Critical Skills and Knowledge Requirements of IS Professionals: A Joint Academic/Industry Investigation" 19 (19): 313-340, 1995

    43 O’Reilly, C.A., "Corporations, Culture, and Commitment: Motivation and Social Control in Organizations" 31 (31): 9-25, 1989

    44 Howel, J.M., "Champion of Technological Innovation" 35 (35): 317-341, 1990

    45 Kaplan, R.S., "Balanced Scorecard" Harvard Business SchoolPress 1996

    46 Kwak, Y.H., "Assessing the Value of Project Management Offices (PMO)" 2000

    47 Igbaria, M., "Antecedents and consequences of job satisfaction among information center employees" 9 (9): 145-174, 1993

    48 Dai, C.X., "An exploration of project management office features and their relationship to project performance" 22 (22): 523-532, 2004

    49 Karlsen, J.T., "An empirical evaluation of knowledge transfer mechanisms for IT projects" 44 (44): 112-119, 2003

    50 Aladwani, A.M., "An Integrated Perfor- mance Model of Information Systems Projects" 19 (19): 185-210, 2002

    51 Byrd, T.A., "An Explor- atory Analysis of the Value of the Skills of IT Personnel: Their Relationship to IS Infrastructure and Competitive Advantage" 32 (32): 21-54, 2001

    52 Wixom, B., "An Empirical Investigation of the Factors Affecting Data Warehousing Success" 25 (25): 17-41, 2001

    53 Goldenson, D.R, "After the appraisal: a systematic survey of process improvement, its benefits and factors that influence success, CMU/SEI-95-TR-009, Software Engineering Institute"

    54 Niazi, M., "A maturity model for the implementation of software process improvement: an empirical study" 74 : 155-172, 2005

    55 Aubry, M., "A New Framework for Understanding Organizational Project Management through the PMO" 25 (25): 328-336, 2007

    56 Andres, H.P., "A Contingency Approach to Software Project Coordination" 18 (18): 41-70, 2002

    57 Rainer, A., ""Key Success Factors for Implementing Software Process Improvement: a Maturity based Analysis" 62 : 71-84, 2002

    58 Dyba, T., ""An Instrument for Measuring the Key Factors of Success in Software Process Improvement" 5 : 357-390, 2000

    더보기

    동일학술지(권/호) 다른 논문

    동일학술지 더보기

    더보기

    분석정보

    View

    상세정보조회

    0

    Usage

    원문다운로드

    0

    대출신청

    0

    복사신청

    0

    EDDS신청

    0

    동일 주제 내 활용도 TOP

    더보기

    주제

    연도별 연구동향

    연도별 활용동향

    연관논문

    연구자 네트워크맵

    공동연구자 (7)

    유사연구자 (20) 활용도상위20명

    인용정보 인용지수 설명보기

    학술지 이력

    학술지 이력
    연월일 이력구분 이력상세 등재구분
    2023 평가 해외DB학술지평가 신청대상 (해외등재 학술지 평가)
    2020-01-01 등재 등재학술지 유지 (해외등재 학술지 평가) KCI등재
    2017-01-01 등재 등재학술지 유지 (계속평가) KCI등재
    2013-01-01 등재 등재 1차 FAIL (등재유지) KCI등재
    2010-01-01 등재 등재학술지 유지 (등재유지) KCI등재
    2009-03-05 학술지명변경 한글명 : 경영정보학 연구 -> Asia Pacific Journal of Information Systems
    외국어명 : The Journal of MIS Research -> Asia Pacific Journal of Information Systems
    KCI등재
    2008-01-01 등재 등재학술지 유지 (등재유지) KCI등재
    2006-01-01 등재 등재학술지 유지 (등재유지) KCI등재
    2004-01-01 등재 등재학술지 유지 (등재유지) KCI등재
    2001-01-01 등재 등재학술지 선정 (등재후보2차) KCI등재
    1998-07-01 등재 등재후보학술지 선정 (신규평가) KCI등재후보
    더보기

    학술지 인용정보

    학술지 인용정보
    기준연도 WOS-KCI 통합IF(2년) KCIF(2년) KCIF(3년)
    2016 0.49 0.49 0.69
    KCIF(4년) KCIF(5년) 중심성지수(3년) 즉시성지수
    0.73 0.7 0.808 0.1
    더보기

    이 자료와 함께 이용한 RISS 자료

    나만을 위한 추천자료

    해외이동버튼