RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      국내 종합병원 리모델링 사례  :  강북 삼성병원 Kangbuk Samsung Hospital = A Case Study on Hospital Remodeling in Korea

      한글로보기

      https://www.riss.kr/link?id=A30039598

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract)

      Korea currently faces a new era of remodeling in hostpital architecture. The findings through this research are as follows: 1) The Korean general hospitals' construction volume has risen 210% since last 25 years. It was therefore suggested that a sys...

      Korea currently faces a new era of remodeling in hostpital architecture. The findings through this research are as follows:
      1) The Korean general hospitals' construction volume has risen 210% since last 25 years. It was therefore suggested that a systematic responses against this high rate of volume must be provided for hospitals built in 1970's and 1980's. Impromptu responses disregarding overall functional recovery might be an interesting factor in remodeling.
      2) In hospital extension and reconstructions, each methods must be set up according to the different characteristics of areas such as ward areas, outpatient areas, diagnosis/treatment areas, supply areas, administration areas, education/research areas, miscellaneous areas. According to department's characteristics, different remodeling strategy must be established.
      3) The case of Kangbuk Samsung Hospital shows that most difficult departments for area correspondence are diagnosis/treatment areas and supply areas. The remodeling for other departments such as the ward areas, the outpatient areas, lobby areas, etc., the new definition of patients rather than area provision is considered to be more important. And new creative suggestions are required.
      4) The hospitals' expansion cycle differs significantly from each other depending on the allowance area at erection time. In case of Kangbuk Samsung Hospital, area at the planning stage the allowance area was not enough planned at the planning stage. so, it caused the frequent department relocation and interior remodeling and resulted an increased remodeling time and cost.
      5) The research suggests that it is ideal to expand the area in connection with the existing department. In case of Kangbuk Samsung Hospital, the expansion was made by the surrounding annex buildings around the existing buildings. The type of expansion minimally affects the construction process the natural light, and the easy provision of sufficient areas at the same time; however, it cases the problems of functional relocation due to the department change and the internal modification.
      Korea hospital now enters the new era of remodeling from that of new construction. This is the architectural planning study to examine the changes and the problems associated with the Kangbuk Samsung Hospital after the construction and to provide the functional recovery of the hospital. It is suggested that the comprehensive hospital remodeling study in the aspects of structure, construction, HVAC, construction management is very urgent in the future.

      더보기

      동일학술지(권/호) 다른 논문

      동일학술지 더보기

      더보기

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼