RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      KCI등재 SCIE SCOPUS

      Developing a PLS Path Model to Investigate the Factors Influencing Safety Performance Improvement in Construction Organizations

      한글로보기

      https://www.riss.kr/link?id=A103547609

      • 0

        상세조회
      • 0

        다운로드
      서지정보 열기
      • 내보내기
      • 내책장담기
      • 공유하기
      • 오류접수

      부가정보

      다국어 초록 (Multilingual Abstract)

      This paper focused on investigating the key factors for safety improvement in construction organizations and the causal relationship among the key factors using Partial Least Squares Structural Equation Modeling approach (PLS-SEM). A hypothetical conc...

      This paper focused on investigating the key factors for safety improvement in construction organizations and the causal relationship among the key factors using Partial Least Squares Structural Equation Modeling approach (PLS-SEM). A hypothetical conceptual model for improving safety performance was developed based on the European Foundation for Quality Management (EFQM) model, which provides the framework for organizational management systems in identifying the areas of performance improvement.
      The conceptual model is composed of five enablers namely Leadership, People, Partnership and Resources, Policy and Strategy and Process and one Result criteria which are achieving the goals of safety performance improvement. The study has adopted questionnaire survey as the methodology to test the conceptual model. The indicators for these enablers and result criteria were extracted from the past literature and by a pilot study. Then a questionnaire was framed as per the discussion with the experts in the construction industry and distributed to clients, contractors and consultants. The results of the model suggested that leadership construct strongly influences people (path coefficient = 0.52) and process construct strongly influences the goals of attaining safety performance improvement (path coefficient = 0.68 and R2 value = 0.457). The Global fit index of the model was found to be 0.42 which suggest that the model has good reliability and validity and fits the data very well. The findings from this study provide insight to construction professionals to focus on the implications from leadership factors and process factors to improve the safety performance within an organization.

      더보기

      참고문헌 (Reference)

      1 Aibinu, A. A., "Using PLS- SEM technique to model construction organization’s willingness to participate in ebidding" 19 (19): 714-724, 2010

      2 Hulland, J., "Use of Partial Least Squares (PLS) in strategic management research: A review of four recent studies" 20 (20): 195-204, 1999

      3 Akter, S., "Trustworthiness in m-Health information services: an assessment of a hierarchical model with mediating and moderating effects using partial least squares (PLS)" 62 (62): 100-116, 2011

      4 Henseler, J., "The use of partial least squares path modeling in international marketing" 20 (20): 277-319, 2009

      5 Chin, W. W., "The partial least squares approach to structural equation modelling" Lawrence Erlbaum Associates 1998

      6 Stranks, J., "The handbook of health and safety practice" Prentice Hall 2000

      7 Hakes, C., "The EFQM Excellence Model to assess organizational performance: A Management Guide" Van Haren Publishing 2007

      8 O’Toole, M. F., "Successful safety committees: participation not legislation" 30 (30): 39-65, 1999

      9 Fornell, C., "Structural equation models with unobservable variables and measurement error: Algebra and statistics" 18 (18): 328-388, 1981

      10 Groanland, E., "Structural equation modelling-A Verbal Approach" 12 (12): 1-39, 2012

      1 Aibinu, A. A., "Using PLS- SEM technique to model construction organization’s willingness to participate in ebidding" 19 (19): 714-724, 2010

      2 Hulland, J., "Use of Partial Least Squares (PLS) in strategic management research: A review of four recent studies" 20 (20): 195-204, 1999

      3 Akter, S., "Trustworthiness in m-Health information services: an assessment of a hierarchical model with mediating and moderating effects using partial least squares (PLS)" 62 (62): 100-116, 2011

      4 Henseler, J., "The use of partial least squares path modeling in international marketing" 20 (20): 277-319, 2009

      5 Chin, W. W., "The partial least squares approach to structural equation modelling" Lawrence Erlbaum Associates 1998

      6 Stranks, J., "The handbook of health and safety practice" Prentice Hall 2000

      7 Hakes, C., "The EFQM Excellence Model to assess organizational performance: A Management Guide" Van Haren Publishing 2007

      8 O’Toole, M. F., "Successful safety committees: participation not legislation" 30 (30): 39-65, 1999

      9 Fornell, C., "Structural equation models with unobservable variables and measurement error: Algebra and statistics" 18 (18): 328-388, 1981

      10 Groanland, E., "Structural equation modelling-A Verbal Approach" 12 (12): 1-39, 2012

      11 Chinda, T., "Structural equation model of construction safety culture, Engineering" 15 (15): 114-131, 2008

      12 Martinsen, A., "Strategy and planning for innovation management – supported by creative and learning organizations" 16 (16): 878-891, 1999

      13 Cohen, J., "Statistical power analysis for the behavioural sciences" Lawrence Erlbaum Associates 1988

      14 Oyewole, S. A., "Statistical evaluation and analysis of safety intervention in the determination of an effective resource allocation strategy" 23 (23): 585-593, 2010

      15 Ringle, C. M., "SmartPLS 2.0 (M3 Beta)"

      16 Koehn, E., "Safety in developing countries: Professional and bureaucratic problems" 121 (121): 261-265, 1995

      17 Jannadi, O. A., "Safety factors considered by industrial contractors in Saudi Arabia" 37 (37): 539-547, 2002

      18 Langford, D., "Safety behaviour and safety management: its influence on the attitudes of workers in the UK construction industry" 7 (7): 133-140, 2000

      19 Osama Jannadi, M., "Safety assessment in the built environment of Saudi Arabia" 29 (29): 15-24, 1998

      20 Fung, I. W. H., "Safety Cultural Divergences among Management, Supervisory and Worker Groups in Hong Kong Construction Industry" 23 (23): 504-512, 2005

      21 Monecke, A., "SEM PLS: Structural equation modeling using partial least squares" 48 (48): 1-32, 2012

      22 Calvo-mora, A., "Relationships between the EFQM model criteria: A study in Spanish universities" 16 (16): 741-770, 2005

      23 Wu, T., "Predicting safety culture: The roles of employer, operations manager and safety professional" 41 (41): 423-431, 2010

      24 Hair, J. F., "PLS-SEM: Indeed a silver bullet" 19 (19): 139-151, 2011

      25 Tenenhaus, M., "PLS Path Modelling" 48 (48): 159-205, 2005

      26 Winn, B. A., "Organizational quality: An examination of the Baldrige national quality framework" 39 (39): 491-512, 1998

      27 Rahman, I. A., "Modeling causes of cost overrun in large construction projects with partial least Square-SEM Approach: Contractor's Perspective" 5 (5): 1963-1972, 2013

      28 Ling, F. Y., "Mathematical models for predicting Chinese A/E/C firms' competitiveness" 24 (24): 40-51, 2012

      29 Pungvongsanuraks, P., "Investigation of safety perceptions of management and workers in Thai construction industry" 17 (17): 177-191, 2010

      30 Al-Kilani, F. M., "Improving safety performance in construction projects in Libya (Case study: in Tripoli city)" Diponegoro university 2011

      31 George, C., "Implementing the EFQM excellence model in a local authority" 18 (18): 122-127, 2003

      32 Rowlinson, S., "Hong Kong construction: Safety management and law" Sweet and Maxwell Asia 2003

      33 Teo, E. A. L., "Framework for project managers to manage construction safety" 23 (23): 329-341, 2005

      34 Abdul-Rashid, I., "Factors affecting safety performance in large construction contractors in Egypt" 661-670, 2007

      35 Pungvongsanuraks, P., "Exploratory factor analysis of safety culture in thai construction industry" 91-100, 2010

      36 Lim, B. T., "Empirical analysis of the determinants of organizational flexibility in the construction business" 137 (137): 225-237, 2010

      37 Wright, M. S., "Development of a business excellence model of safety culture: Safety culture improvement matrix" Entec UK Ltd 1999

      38 Barling, J., "Development and test of a model linking safety-specific transformational leadership and occupational safety" 87 (87): 488-496, 2002

      39 Al-Haadir, S., "Critical success factors for safety program implementation among construction companies in Saudi Arabia" 14 : 148-155, 2011

      40 Chinda, T., "Causal relationships between enablers of Construction safety culture" 438-445, 2007

      41 Tutuncu, O., "Canonical correlation between job satisfaction and EFQM business excellence model" 44 (44): 1227-1238, 2009

      42 Robinson, H. S., "Business performance measurement practices in Construction Engineering organizations" 9 (9): 13-22, 2005

      43 Hatush, Z., "Assessment and evaluation of contractor data against client goals using PERT approach" 15 (15): 327-340, 1997

      44 Enshassi, A., "Assessing the level of the safety practice in construction companies in Palestine" 19 (19): 87-102, 2011

      45 Cohen, J., "Applied Multiple Regression/Correlation Analysis for the Behavioral Sciences" Lawrence Erlbaum Associates 2003

      46 Abudayyeh, O., "An investigation of management’s commitment to construction safety" 24 (24): 167-174, 2006

      47 Wilson, D. D., "An empirical investigation of the malcolm baldrige national quality award causal model" 31 (31): 361-390, 2000

      48 Carlos Bou-Llusar, J., "An empirical assessment of the EFQM excellence model: Evaluation as a TQM framework relative to the MBNQA Model" 27 (27): 1-22, 2009

      49 Gambatese, J., "Addressing construction worker safety in the design phase-designing for construction worker safety" 8 (8): 643-649, 1999

      50 Pannirselvam, G. P., "A study of the relationship between the Baldrige categories" 18 (18): 14-34, 2001

      51 Thomas Ng, S., "A framework for evaluating the safety performance of construction contractors" 40 (40): 1347-1355, 2005

      52 Eskildsen, J. K., "A causal model for employee satisfaction" 11 (11): 1081-1094, 2000

      더보기

      분석정보

      View

      상세정보조회

      0

      Usage

      원문다운로드

      0

      대출신청

      0

      복사신청

      0

      EDDS신청

      0

      동일 주제 내 활용도 TOP

      더보기

      주제

      연도별 연구동향

      연도별 활용동향

      연관논문

      연구자 네트워크맵

      공동연구자 (7)

      유사연구자 (20) 활용도상위20명

      인용정보 인용지수 설명보기

      학술지 이력

      학술지 이력
      연월일 이력구분 이력상세 등재구분
      2023 평가예정 해외DB학술지평가 신청대상 (해외등재 학술지 평가)
      2020-01-01 평가 등재학술지 유지 (해외등재 학술지 평가) KCI등재
      2010-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2008-01-01 평가 등재학술지 유지 (등재유지) KCI등재
      2005-05-27 학술지명변경 한글명 : 대한토목학회 영문논문집 -> KSCE Journal of Civil Engineering KCI등재
      2005-01-01 평가 등재학술지 선정 (등재후보2차) KCI등재
      2004-01-01 평가 등재후보 1차 PASS (등재후보1차) KCI등재후보
      2002-01-01 평가 등재후보학술지 선정 (신규평가) KCI등재후보
      더보기

      학술지 인용정보

      학술지 인용정보
      기준연도 WOS-KCI 통합IF(2년) KCIF(2년) KCIF(3년)
      2016 0.59 0.12 0.49
      KCIF(4년) KCIF(5년) 중심성지수(3년) 즉시성지수
      0.42 0.39 0.286 0.06
      더보기

      이 자료와 함께 이용한 RISS 자료

      나만을 위한 추천자료

      해외이동버튼