1 Klibi, W., "The design of robust value-creating supply chain net-works : a critical review" 203 (203): 283-293, 2010
2 Schmitt, A. J., "Strategies for customer service level protection under multi-echelon supply chain disruption risk" 45 (45): 1266-1283, 2011
3 Yu, H., "Single or dual sourcing : decision-making in the presence of supply chain disruption risks" 37 (37): 788-800, 2009
4 Shimizu, Y., "Robust logistics network modeling and design against uncertainties" 5 (5): 103-114, 2011
5 Peng, P., "Reliable logistics networks design with facility disruptions" 45 (45): 1190-1211, 2011
6 Cui, T., "Reliable facility location design under the risk of disruptions" 58 (58): 998-1011, 2010
7 Snyder, L. V., "Reliability models for facility location : the expected failure cost case" 39 (39): 400-416, 2005
8 Tang, C. S., "Perspectives in supply chain risk management" 103 (103): 451-488, 2006
9 Tomlin, B., "On the value of mitigation and contingency strategies for managing supply chain disruption risks" 52 (52): 639-657, 2006
10 Shimizu, Y., "Multimodal logistics network design over planning horizon through a hybrid meta-heuristic approach" 2 (2): 915-925, 2008
1 Klibi, W., "The design of robust value-creating supply chain net-works : a critical review" 203 (203): 283-293, 2010
2 Schmitt, A. J., "Strategies for customer service level protection under multi-echelon supply chain disruption risk" 45 (45): 1266-1283, 2011
3 Yu, H., "Single or dual sourcing : decision-making in the presence of supply chain disruption risks" 37 (37): 788-800, 2009
4 Shimizu, Y., "Robust logistics network modeling and design against uncertainties" 5 (5): 103-114, 2011
5 Peng, P., "Reliable logistics networks design with facility disruptions" 45 (45): 1190-1211, 2011
6 Cui, T., "Reliable facility location design under the risk of disruptions" 58 (58): 998-1011, 2010
7 Snyder, L. V., "Reliability models for facility location : the expected failure cost case" 39 (39): 400-416, 2005
8 Tang, C. S., "Perspectives in supply chain risk management" 103 (103): 451-488, 2006
9 Tomlin, B., "On the value of mitigation and contingency strategies for managing supply chain disruption risks" 52 (52): 639-657, 2006
10 Shimizu, Y., "Multimodal logistics network design over planning horizon through a hybrid meta-heuristic approach" 2 (2): 915-925, 2008
11 Rusman, M., "Morphological analysis for multistage logistic network optimization under disruption risk" 63 (63): 289-297, 2012
12 Chopra, S., "Managing risk to avoid supply-chain breakdown" 46 (46): 53-61, 2004
13 Kleindorfer, P. R., "Managing disruption risks in supply chain" 14 (14): 53-58, 2005
14 Tang, O., "Identifying risk issues and research advancements in supply chain risk management" 133 (133): 25-34, 2011
15 Berman, O., "Facility reliability issues in network p-median problems : strategic centralization and co-location effects" 55 (55): 332-350, 2007
16 Melo, M. T., "Facility location and supply chain management : a review" 196 (196): 401-412, 2009
17 Rusman, M., "Comparison of multistage logistic network design as critical infrastructure under disruption risk" 1563-1568, 2011
18 Shimizu, Y., "A hybrid approach for huge multi-stage logistic network optimization under disruption risk" 45 (45): 597-603, 2012
19 Shimizu, Y., "A flexible design for logistic network under uncertain demands through hybrid meta-heuristic strategy, Transactions of the Institute of Systems" 19 (19): 342-349, 2006
20 Lim, M., "A facility reliability problem : formulation, properties, and algorithm" 57 (57): 58-70, 2009