1 Reveliotis,S.A, "The destabilizing effect of blocking due to finite buffering capacity in multi-class queueing networks" 45 (45): 585-588, 2000
2 Wein,L.M, "Scheduling semiconductor wafer fabrication" 1 (1): 115-130, 1988
3 Kumar,P.R, "Scheduling semiconductor manufacturing plants" 14 (14): 33-40, 1994
4 Kumar,P.R, "Scheduling manufacturing systems of re-entrant lines, In Stochastic Modeling and Analysis of Manufacturing Systems" Springer-Verlag 325-360, 1994
5 Choi,J.Y, "Relative value function approximation for the capacitated re-entrant line scheduling problem" 2 (2): 285-299, 2005
6 Sutton,R.S, "Reinforcement Learning(An Introduction)" MIT Press 1999
7 Reveliotis, S. A, "Real-time management of resource allocation systems" Springer 2005
8 Kumar,S, "Queueing network models in the design and analysis of semiconductor wafer fabs" 17 (17): 548-561, 2001
9 Jolliffe, I. T, "Principal Component Analysis" Springer-Verlag 2002
10 Bertsekas,D.P, "Neuro-Dynamic Programming" Athena Scientific 1996
1 Reveliotis,S.A, "The destabilizing effect of blocking due to finite buffering capacity in multi-class queueing networks" 45 (45): 585-588, 2000
2 Wein,L.M, "Scheduling semiconductor wafer fabrication" 1 (1): 115-130, 1988
3 Kumar,P.R, "Scheduling semiconductor manufacturing plants" 14 (14): 33-40, 1994
4 Kumar,P.R, "Scheduling manufacturing systems of re-entrant lines, In Stochastic Modeling and Analysis of Manufacturing Systems" Springer-Verlag 325-360, 1994
5 Choi,J.Y, "Relative value function approximation for the capacitated re-entrant line scheduling problem" 2 (2): 285-299, 2005
6 Sutton,R.S, "Reinforcement Learning(An Introduction)" MIT Press 1999
7 Reveliotis, S. A, "Real-time management of resource allocation systems" Springer 2005
8 Kumar,S, "Queueing network models in the design and analysis of semiconductor wafer fabs" 17 (17): 548-561, 2001
9 Jolliffe, I. T, "Principal Component Analysis" Springer-Verlag 2002
10 Bertsekas,D.P, "Neuro-Dynamic Programming" Athena Scientific 1996
11 Puterman, M. L, "Markov Decision Processes : Discrete Stochastic Dynamic Programming" Wiley 1994
12 Kumar,S, "Fluctuation smoothing policies are stable for stochastic re-entrant lines" 6 : 361-370, 1996
13 Tsitsiklis,J.N, "Feature-based methods for large scale dynamic programming" 22 : 59-94, 1996
14 Lu,S.H, "Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants" 7 (7): 374-385, 1994
15 Lu,S.H, "Distributed scheduling based on due dates and buffer priorities" 36 (36): 1406-1416, 1991
16 Choi, J. Y, "Computationally efficient neuro-dynamic programming approximation method for the capacitated re-entrant line scheduling problem"
17 Tsitsiklis,J.N, "Average cost temporaldifference learning" 35 : 1799-1808, 1999
18 Rossetti,M.D, "A simulation-based approximate dynamic programming approach for the control of the intel mini-fab benchmark model" 2009