1 A. Motaghedi, "solving flexible job shop scheduling problem with multi objectives" 21 : 197-209, 2010
2 M. R. Garey, "The complexity of flow shop and job shop scheduling," 1 : 117-129, 1976
3 B. S. Girish, "Scheduling job shops associated with multiple routings with genetic and ant colony heuristics" 2008
4 P. Brandimarte, "Routing and scheduling in a flexible job shop by tabu search" 41 : 157-183, 1993
5 Wei Sun, "Research on flexible job-shop scheduling problem based on a modified genetic algorithm" 대한기계학회 24 (24): 2119-2125, 2010
6 I. Kacem, "Pareto-optimality approach for flexible job shop scheduling problems, Hybridization of evolutionary algorithms and fuzzy logic" 60 : 245-276, 2002
7 박용국, "Optimization of mixed casting processes considering discrete ingot sizes" 대한기계학회 23 (23): 1899-1910, 2009
8 K. Mesghani, "On modeling genetic algorithms for flexible job shop scheduling problems" 1998
9 H. P. Zhang, "Multistage-based genetic algorithm for flexible job shop scheduling problem" 48 : 409-425, 2005
10 L. N. Xing, "Multi population interactive coevolutionnary algorithm for flexible job shop scheduling problems" 2009
1 A. Motaghedi, "solving flexible job shop scheduling problem with multi objectives" 21 : 197-209, 2010
2 M. R. Garey, "The complexity of flow shop and job shop scheduling," 1 : 117-129, 1976
3 B. S. Girish, "Scheduling job shops associated with multiple routings with genetic and ant colony heuristics" 2008
4 P. Brandimarte, "Routing and scheduling in a flexible job shop by tabu search" 41 : 157-183, 1993
5 Wei Sun, "Research on flexible job-shop scheduling problem based on a modified genetic algorithm" 대한기계학회 24 (24): 2119-2125, 2010
6 I. Kacem, "Pareto-optimality approach for flexible job shop scheduling problems, Hybridization of evolutionary algorithms and fuzzy logic" 60 : 245-276, 2002
7 박용국, "Optimization of mixed casting processes considering discrete ingot sizes" 대한기계학회 23 (23): 1899-1910, 2009
8 K. Mesghani, "On modeling genetic algorithms for flexible job shop scheduling problems" 1998
9 H. P. Zhang, "Multistage-based genetic algorithm for flexible job shop scheduling problem" 48 : 409-425, 2005
10 L. N. Xing, "Multi population interactive coevolutionnary algorithm for flexible job shop scheduling problems" 2009
11 P. Fattahi, "Mathematical modeling and heuristic approaches to flexible job shop scheduling problems" 18 : 331-342, 2007
12 P. Brucker, "Job-shop scheduling with multipurpose machines," 45 (45): 369-375, 1990
13 J. A. Paulli, "Hierarchical approach for the FMS scheduling problem" 86 (86): 32-42, 1995
14 S. G. Pannanbalam, "Giffler and Thampson Procedure based genetic algorithms for scheduling job shops" Springer-Verbag Berlin Heidelberg 229-259, 2009
15 J. J. Palacios, "Genetic tabu search for the fuzzy flexible job shop problem" 5474-5489, 2014
16 H. Chen, "Genetic algorithm for flexible Job shop scheduling" 2 : 1120-1128, 1999
17 N. B. Ho, "GENACE : An efficient cultural algorithm for solving the flexible job shop problem" 1 : 1759-1766, 2004
18 J. C. Chen, "Flexible job shop with parallel machines using genetic algorithm and grouping genetic algorithm" 39 : 10016-10021, 2012
19 J. C. Tay, "Evolving dispatching rules using genetic programming for solving multi- objective flexible jobshop problems" 54 : 453-473, 2008
20 김남일, "Damage detection of truss structures using two-stage optimization based on micro genetic algorithm" 대한기계학회 28 (28): 3687-3695, 2014
21 I. Kacem, "Approche by localization and multiobjective evolutionary and optimization for flexible job shop scheduling problems" 32 (32): 1-13, 2002
22 Ravindra Nath Yadav, "Application of non-dominated sorting genetic algorithm for multi-objective optimization of electrical discharge diamond face grinding process" 대한기계학회 28 (28): 2299-2306, 2014
23 G. Zhang, "An effective genetic algorithm for the flexible job shop scheduling problem" 38 : 3563-3573, 2011
24 N. B. Ho, "An effective architecture for learning and evolving flexible job shop schedules" 179 : 316-333, 2007
25 J. Gao, "A hybrid of genetic algorithm and bottleneck shifting for multi objective flexible job shop scheduling problems" 53 : 149-162, 2007
26 Q. Zhang, "A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constants and bounded proceding times" 39 : 1713-1723, 2012
27 Shun-Fa Hwang, "A genetic algorithm for the optimization of fiber angles in composite laminates" 대한기계학회 28 (28): 3163-3169, 2014
28 F. Pezzela, "A genetic algorithm for flexible job shop scheduling problem" 35 (35): 3202-3212, 2007
29 F. N. Defersha, "A coase-grain parallel genetic algorithm for flexible job shop scheduling with lot streaming" 2009