Purpose: This study was conducted to develop an optimal combine scheduling program using Max-Coverage algorithm which derives the maximum efficiency for a specific location in harvest seasons. Methods: The combine scheduling program was operated with ...
Purpose: This study was conducted to develop an optimal combine scheduling program using Max-Coverage algorithm which derives the maximum efficiency for a specific location in harvest seasons. Methods: The combine scheduling program was operated with information about combine specification and farmland. Four operating types (Max-Coverage algorithm type, Boustrophedon path type, max quality value type, and max area type) were selected to compare quality and working capacity. Result: The working time of Max-Coverage algorithm type was shorter than others, and the total quality value of Max-Coverage algorithm and max quality value type were higher than others. Conclusion: The developed combine scheduling program using Max-Coverage algorithm will provide optimal operation and maximum quality in a limited area and time.