In-grid Demonstration of High-temperature Superconducting Cable
Ohya, Masayoshi,Ashibe, Yuichi,Watanabe, Michihiko,Yumura, Hiroyasu,Nakanishi, Tatsuo,Hirota, Hirofumi,Masuda, Takato,Ichikawa, Hiroshi,Mimura, Tomoo,Honjo, Shoichi,Hara, Tsukushi The Korean Institute of Electrical Engineers 2013 The Journal of International Council on Electrical Vol.3 No.2
In a national project that began in 2007, Tokyo Electric Power Company (TEPCO), Sumitomo Electric Industries (SEI) and Mayekawa Mfg. Corporation (MYCOM) aim to operate a 66 kV, 200 MVA HTS cable system in a power grid to demonstrate its reliability and stable operation. In order to verify the validity of the cable design, a 30 m HTS cable system was constructed and subjected to various tests. After the confirmation of the nominal current and voltage performance, a long-term operation test was performed to verify whether the HTS cable system is capable of handling the rated current and voltage for thirty years. A 250 m cable was manufactured for the in-grid demonstration, and shipping tests were successful. The cable system construction was completed at the Asahi substation (Yokohama, Kanagawa), and the in-grid demonstration will start in 2012.