RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제
      • 좁혀본 항목 보기순서

        • 원문유무
        • 원문제공처
        • 등재정보
        • 학술지명
          펼치기
        • 주제분류
        • 발행연도
          펼치기
        • 작성언어
        • 저자
          펼치기

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • Earthquake resistance of structural walls confined by conventional tie hoops and steel fiber reinforced concrete

        Eom, Taesung,Kang, Sumin,Kim, Okkyue 테크노프레스 2014 Earthquakes and structures Vol.7 No.5

        In the present study, the seismic performance of structural walls with boundary elements confined by conventional tie hoops and steel fiber concrete (SFC) was investigated. Cyclic lateral loading tests on four wall specimens under constant axial load were performed. The primary test parameters considered were the spacing of boundary element transverse reinforcement and the use of steel fiber concrete. Test results showed that the wall specimen with boundary elements complying with ACI 318-11 21.9.6 failed at a high drift ratio of 4.5% due to concrete crushing and re-bar buckling. For the specimens where SFC was selectively used in the plastic hinge region, the spalling and crushing of concrete were substantially alleviated. However, sliding shear failure occurred at the interface of SFC and plain concrete at a moderate drift ratio of 3.0% as tensile plastic strains of longitudinal bars were accumulated during cyclic loading. The behaviors of wall specimens were examined through nonlinear section analysis adopting the stress-strain relationships of confined concrete and SFC.

      • KCI등재

        현황조사를 통한 농촌주거의 성능검토 및 재생지원방안

        박준모,김옥규,Park, Junmo,Kim, Okkyue 한국건설관리학회 2015 건설관리 : 한국건설관리학회 학회지 Vol.16 No.2

        산업 및 사회발전의 고도화를 통해 국내 도시는 주택 및 각종 시설이 개선된 반면, 농촌은 그에 크게 미치지 못하고 있다. 또한, 주민의 고령화로 인한 유지보수를 적기에 실시 못하는 문제나, 경제적으로 어려운 상황 속에서 제대로 된 공법, 기술, 재료를 이용한 개축 등을 하는 것을 기대할 수 없는 실정이다. 본 연구는 농촌주민의 고령화 및 농촌주거의 노후화에 따른 문제점에 대한 현황조사를 통해 지역실정에 적합한 농촌주거의 재생방안을 모색하였다. 그 결과, 주거양식은 한국의 전통가옥양식이 절반가량을 차지하고 있었으며, 서구식 주거양식의 농촌주택에 비해 상대적으로 주거수준이 열악한 것으로 나타났다. 구조형식은 순수구조와 복합구조가 각기 절반씩을 차지하고 있었으며, 그 중에서 한국의 전통가옥양식은 순수구조보다는 복합구조가 많았다. 이는 본래의 모습으로는 내구성능, 거주자의 용도 등의 기능을 충족시킬 수 없기 때문에 거주자에 의해 지속적인 변화가 계속되었기 때문인 것으로 사료된다. 이러한 문제점에 대해 농촌지역의 특성에 알맞는 농촌주거 개선이 필요하다. The urban has been improved houses and facilities as accelerating industry and society, while the rural area was inferior to the city. Furthermore, there was not a maintenance in time as ageing, and did not expect to rebuilding of using proper techniques and materials for financial reasons. This study find a way to make a revitalizing plan for appropriate real state. For this, perform a current status survey that 900 rural residences of 36 rural villages in Chungcheong area. As a result, Korean traditional structure is a half in residential type, and has poor residential conditions by comparison with western pattern. The structural type comprises two type that a pure structure and a mixed structure, and Korean traditional structure is a mixed structure more than a pure structure. It is considered continuous changes by a resident due to a pure structure was not satisfy various functions. It need appropriate plan to improve a rural residence for each characteristics.

      • KCI등재

        현장중심의 건설가설기술요소 분류체계 구축

        박준모,김옥규,Park, Junmo,Kim, Okkyue 한국건설관리학회 2014 한국건설관리학회 논문집 Vol.15 No.4

        건설가설공사는 타워크레인, 리프트와 같은 가설양중설비나 사무소, 창고, 시험소 등의 가설건축물 및 각종 작업에서 사용되는 비계, 작업발판, 동바리, 거푸집 등을 일시적으로 조립, 설치하여 사용하고 공사가 완료된 후에는 철거하는 건설공사의 주요 과정인 동시에 핵심공종이다. 새로운 요구사항에 대한 건설현장의 발 빠른 대응과는 달리 국내의 건설가설분야의 기술체계는 실무에서 효용성이 낮아 개선이 필요한 실정이다. 이에 본 연구에서는 기존 기술체계와 현업에서 활용되고 있는 새로운 기술과 기법 등을 정리하고, 현장관리자의 의견과 검토를 통한 가설기술의 기초가 되는 기술요소의 분류체계를 구축하였다. 이를 바탕으로 향후 건설가설기술요소에 대한 성능과 활용성에 대한 연구를 통하여 지식정보체계로 거듭날 수 있도록 개선해 나갈 예정이다. A construction temporary work is main process and importance trade section. It has many works and facilities such as temporary transfer equipments which tower crane, and lift, and architectural temporary facilities which temporary office, temporary warehouse, and site test laboratory, and construction temporary equipments which scaffoldings, work plates, construction supports, and forms to set and to use in under construction and to remove in the end. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study is organized existing technology systems and new technologies for field works, and developed breakdown structure of construction temporary technologies to be a basic of temporary technologies as review with site managers. For this, it will improve to be a knowledge and information system as a research of a performance and an availability about a construction temporary technology index.

      • KCI등재

        종합건설사업관리 사업관리비용산정을 위한 방법연구 - 기획단계에서 실시설계 입찰까지 -

        백명창,박준모,박길범,김옥규,Baek, Myeongchang,Park, Junmo,Park, Gilbeom,Kim, Okkyue 한국건설관리학회 2014 한국건설관리학회 논문집 Vol.15 No.5

        With the scale of program management getting larger and complexity, More accurate and precise method for management cost estimate is demanded. However, most of project management cost estimates are based on similar cases and hence can not reflect distinct features of each project. Cost estimate precision is also not up to the standards, and also troublesome to policy-making and budget allocation. Therefore, project typical model for cost estimate of Comprehensive Project Management is developed, and makes it easier to manage level of effort and allocate cost by applying characteristic factor of each project. This study categorized the project package by phase; planning, detailed design, and bid procurement, to develop typical model. And by designating specific level of effort required for each field and rank, the study aims to improve the method for calculating the detailed and objective program cost. Outcome of this study will prevent conflicts between client and contractor, accurately calculate program management contract cost for the client, and become a reference for the contractor to receive rational and practical payments for their work. 종합건설사업관리 발주의 대형화, 복합화로 사업관리 비용산정을 위하여 보다 정확하고 신속한 기법이 요구되나, 대부분의 경우 사업비 추정을 위한 대가산정을 유사사례를 기준으로 사업관리비 산정을 추정함으로써 사업별 특성을 반영할 수 없으며, 사업관리비 산정에 대한 정확성도 떨어지고 그에 따른 정책 및 예산을 반영하기가 어려운 것이 사실이다. 따라서 종합사업관리의 사업비 추정을 위한 프로젝트 기준모델을 개발하여 프로젝트별 특성을 반영한 인자를 적용하여 사업관리 인력 및 비용 산정을 쉽게 할 수 있다. 본 연구에서는 종합사업관리용역 비용 산정을 위하여 기획단계에서 실시설계 입찰단계까지의 기본모델 작성에 대한 각 단계별 세부업무 패키지를 분류하고, 각 패키지의 상세 과업내용에 대한 분야별, 등급별 투입인력을 산정하여 보다 상세하고 객관적인 사업관리 비용을 산정하는 방법론에 대하여 연구하고자 한다. 본 연구의 결과물은 발주자와 사업관리 용역업자 간의 분쟁을 사전에 예방할 수 있으며, 발주자 입장에서는 투명한 사업관리용역 비용산정이 가능해지고, 용역업자 입장에서는 업무성과에 대한 합리적인 대가를 지급받을 수 있는 근거를 제시할 수 있을 것이라고 기대한다.

      • KCI등재

        기준모델을 사용한 종합사업관리용역비 산정방법(ICEP) 연구

        백명창,박준모,박길범,김옥규,Baek, Myeongchang,Park, Junmo,Park, Gilbeom,Kim, Okkyue 한국건설관리학회 2015 한국건설관리학회 논문집 Vol.16 No.1

        국내 종합사업관리 용역비 산정을 위하여 대부분의 경우, 유사 사업관리 산정사례를 참고하여 추정하거나 과업참여자의 경험을 바탕으로 비용을 산정하였음을 알 수 있다. 이는 사업관리비 산정에 대한 정확성이 떨어져 사업을 주관하는 발주기관에서는 사업계획 및 예산 반영이 어려우며, 추정치에 의한 용역비 산정으로 향후 설계변경 등의 사업관리용역비 증가의 원인이 되기도 한다. 따라서 발주자와 용역 참여자가 보다 정확한 용역비를 산정하여 변경사항 등으로 인한 비용증가와 분쟁을 최소화하기 위해서는 용역비 산정기준을 객관적이고 과학적인 방법으로 적용할 필요가 있다. 종합건설사업 관리의 용역비 산정을 위해 기존의 경우에는 사례와 경험을 기초로 한 Top-Down 방식으로 접근하였다면, 본 연구에서는 사업관리 업무를 세부단계 및 활동(Activity)으로 분류하고 단계별로 WBS를 부여하여 각각 부여된 코드에 일정과 비용을 산정하는 Bottom-Up 방식의 사업관리 용역비를 산정하는 것으로, 용역비 산정을 위한 프로젝트 기준모델을 개발하고 프로젝트별 보정계수를 적용하여 용역비용을 산정하는 방식으로 이를 ICEP이라고 명명하였다. 또한 산정된 해당 과업의 비용과 추후 실적자료를 분석하여 보완함으로써 프로젝트별 특성을 반영한 종합사업관리 용역비 산정으로 효율적인 건설사업 관리가 가능해진다. Domestic dominant method in subcontract cost estimate for comprehensive program management is estimation by referencing similar cases or relying on the experience and expertise of the engaged. However, this method is not reliable due to lack of accuracy, making it harder for clients to plan and budget the program. Since budget itself is roughly estimated, it becomes a source of cost rise in the course of management due to design modifications. Therefore, the client and service providers shall calculate more accurate service cost by applying objective and scientific method in order to minimize cost rise and cost related dispute. Traditional cases, in estimating program management cost, took Top-Down approach based on precedents and experience. On the contrary, this study will categorize management structure into phases and activities, issue WBS for each phase to estimated schedule and cost for each code, and take Bottom-UP approach. By taking this approach named ICEP (Integrated Cost Estimate based on Project), Set project typical model will be developed for service cost estimating, calculate cost by applying project-specific factors. Also, by analyzing progress data and allocated management cost to complement them, more efficient construction management will take shape based on program management cost standards which reflect project-specific features.

      • KCI등재

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼