http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
최경미 ( Kueng Mi Choi ),황현정 ( Hyun Jung Hwang ),전정일 ( Jung Ii Jun ),박용수 ( Yong Soo Park ) 한국의류산업학회 2012 한국의류산업학회지 Vol.14 No.4
To increase the productivity and product quality of customized baseball jerseys, this study developed a multivariable system for a production process that efficiently controls diverse production management factors. The working time was measured through the establishment of a standard process where skilled workers and Chinese factory workers manufactured 5 sets of the same basic design jerseys. Based on the measured working time (1,136 seconds/per unit), the multi-variable process control system was developed, where hourly production management is possible according to the involved workers and equipment types. Each process was assigned accoding to the production management factors for a total of 28 standard processes. The processes were developed based on consideration of work characteristics according to the order of needlework of open-type set baseball jerseys with sleeves(the basic design of baseball jerseys)to result in a customized production system structure that could be set up with multi-variables. As a result, a total 12 types of systems were developed in consideration of the personnel involved and the number of equipments. The optimal production management system (with the highest efficiency compared to the number of workers) was A-2, B-1, C-1, D-2, E-2, F-1, and G-1, This system had extremely high efficiency and showed 99% assignment efficiency for the 7-person team, Though not optimal, possible process assignment for each working personnel is proposed as a reserve process in case work modification is inevitable due to malfunctions and the absence of equipments.