X-12 ARIMA를 이용한 아파트 원가의 변동분석 및 예측모델 개발
조훈희,Cho, Hun-Hee 한국건설관리학회 2005 건설관리 : 한국건설관리학회 학회지 Vol.6 No.6
The construction cost index and the forecasting model of apartment house can be efficient for evaluating the validness of the fluctuating price, and for making guidelines for construction firms when calculating their profit. In this study the previous construction cost index of apartment house was improved, and the forecasting model based on X-12 ARIMA was developed. According to the result, during the last five years the construction cost, excluding labor expense, has risen approximately to 22.7%. And during next three years, additional 16.8% rise of construction cost is expected. Those quantitative results can be utilized for evaluating the apartment house's selling price in an indirection, and be helpful to understand the variation pattern of the price. 아파트 건설원가 추정지수와 그 예측모델은 아파트 분양가격 변동의 적정성을 평가하고 건설기 업이 적정이윤을 계상하도록 유도할 수 있다. 본 연구에서는 기존의 철골 철골조주택 공사비지수를 개선하고, 개선된 지수를 대상으로 X-12 ARIMA 방법에 의한 예측방법을 개발하였다 연구결과 최근 5년간 노무비를 제외하고 약 33.7%의 아파트 건설 원가상승요인이 발생하였으며, 향후 3년간 16.8%가량 추가 상승할 것으로 예측되었다. 이러한 정량적인 연구결과는 최근의 높은 아파트 분양가격의 적정성을 간접적으로 평가하는 지표로 활용될 수 있고, 아파트 건설원가의 변동패턴을 이해하는데 도움을 줄 수 있다.
조훈희,박재우,조문영,김정열,Cho, Hun-Hee,Park, Jae-Woo,Cho, Moon-Young,Kim, Jung-Yeol 한국건설관리학회 2005 건설관리 : 한국건설관리학회 학회지 Vol.6 No.6
강교량 가설공사의 설계는 그동안 과거유사사업의 자료를 토대로 설계자의 경험에 의존하여 진행되어 왔다. 이로 인해 실제 현장에서 소요되는 가벤트에 대하여 과대설계 논란이 있으며, 시공단계에 불필요한 설계변경을 야기하고 있다. 본 연구에서는 강교의 설계작업 과정에서 생성되는 설계 자료와 가설공사의 수행에 필요한 자원에 대한 데이터베이스를 구축하여 강교 설치 가설공사의 최적화설계 지원 시스템을 개발하였다. 이를 통하여 가설시설물에 대한 설계를 최적화하며, 설계변경을 줄이는 데에 기여할 뿐만 아니라 설계정보를 시공단계에 활용하게 함으로써 업무의 효율성과 정확성을 제고하였다. Design of steel $bridge^{\circ}AEs$ temporary works has conducted relying on the experiences of engineers based on the previous similar projects. Consequently, there have been arguments against over-design of temporary bents to be required at the actual construction sites, and unnecessary design changes have been issued at the construction stage. In this study, we have developed an optimum design support system for temporary works of the steel bridge construction through establishing the database for the materials to be needed for implementation of temporary works. We've also improved the accuracy and efficiency of the works through the design optimization for temporary works, and contributed to reduce design changes as well as to utilize the design informations at the construction stage.
건설공사비지수를 활용한 물가변동에 의한 계약금액 조정방안 개선
조훈희,도근영,Cho Hun-Hee,Doe Geun-Young 한국건설관리학회 2005 건설관리 : 한국건설관리학회 학회지 Vol.6 No.1
건설공사의 계약 이후에 발생하는 물가변동에 의한 계약금액의 조정방법으로 지수조정율 방식이 널리 활용되어 왔다. 그러나 지수조정율에 의한 방식에 사용되는 생산자물가지수는 건설공사의 특성이 반영되지 않은 범용적인 지수이기 때문에 실제 건설공사의 물가변동에 대한 설명력이 매우 부족하다. 이에 본 연구에서는 기존의 지수조정율에 의한 계약금액 조정방식의 문제점을 활용 지수측면에서 규명하고, 건설사업의 특성을 반영할 수 있는 건설공사비지수의 활용을 통하여 이러한 문제점을 개선하고자 하였으며, 사례연구를 통하여 그 효용성을 검증하였다. Index adjusted ratio method has been widely utilized in public construction sector for contract sum adjustment by price fluctuation. In this method, the Production Price Index are used for the base ratio, but the PPI can't reflect the character of construction project in respect of the selected items and weight. In this research we prove the problem of using the index adjusted ration method in contact sum adjustment by price fluctuation, and improve it by using the construction cost index, which has the property of construction project. And we figure out the efficiency of the proposed method by case study.