RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제
      • 좁혀본 항목 보기순서

        • 원문유무
        • 원문제공처
        • 등재정보
        • 학술지명
        • 주제분류
        • 발행연도
        • 작성언어
        • 저자
          펼치기

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • KCI등재

        생산투자수익률을 적용한 생산투자사업의 경제성 분석

        김진욱,손임모,신재욱 한국산업경영시스템학회 2017 한국산업경영시스템학회지 Vol.40 No.1

        The IRR (internal rate of return) is often used by investors for the evaluation of engineering projects. Unfortunately, it is widely known that it has serial flaws. Also, External rate of returns (ERRs) such as ARR (Average Rate of Return) or MIRR (MIRR, Modified Internal Rate of Return) do not differentiate between the real investment and the expenditure. The PRR (Productive rate of return) is faithful to the conception of the return on investment. The PRR uses the effective investment instead of the initial investment. In this paper, we examined two cases of the engineering project. the one is a traditional engineering project with financing activity, another is the project with R&D. Although the IRR has only one value, it overestimates or underestimate profitabilities of Engineering Projects. The ARR and the MARR assume that a returned cash reinvest other projects or assets instead of the project currently executing. Thus they are only one value of a project’s profitability, unlike the IRR. But the ARR does not classify into the effective investment and non-investment expenditure. It only accepts an initial expenditure as for an investment. The MIRR also fails to classify into the investment and the expenditure. It has an error of making a loss down as the investment. The IRR works as efficiently as a NPW (Net Present Worth). It clearly expresses a rate of return in respect of an investment in an engineering project with a loan. And it shows its ability in an engineering project with a R&D investment.

      • KCI등재

        An Economic Analysis with the Productive Rate of Return

        Jin Wook Kim(김진욱),Immo Son(손임모),Jaiwook Shin(신재욱) 한국산업경영시스템학회 2017 한국산업경영시스템학회지 Vol.40 No.1

        The IRR (internal rate of return) is often used by investors for the evaluation of engineering projects. Unfortunately, it is widely known that it has serial flaws. Also, External rate of returns (ERRs) such as ARR (Average Rate of Return) or MIRR (MIRR, Modified Internal Rate of Return) do not differentiate between the real investment and the expenditure. The PRR (Productive rate of return) is faithful to the conception of the return on investment. The PRR uses the effective investment instead of the initial investment. In this paper, we examined two cases of the engineering project. the one is a traditional engineering project with financing activity, another is the project with R&D. Although the IRR has only one value, it overestimates or underestimate profitabilities of Engineering Projects. The ARR and the MARR assume that a returned cash reinvest other projects or assets instead of the project currently executing. Thus they are only one value of a project’s profitability, unlike the IRR. But the ARR does not classify into the effective investment and non-investment expenditure. It only accepts an initial expenditure as for an investment. The MIRR also fails to classify into the investment and the expenditure. It has an error of making a loss down as the investment. The IRR works as efficiently as a NPW (Net Present Worth). It clearly expresses a rate of return in respect of an investment in an engineering project with a loan. And it shows its ability in an engineering project with a R&D investment.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼