http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
방제돈 ( Je Don Bang ),오태근 ( Tae Keun Oh ) 한국안전학회(구 한국산업안전학회) 2014 한국안전학회지 Vol.29 No.5
The procedures of safety diagnosis assessment have been applied by synthetical consideration of structural safety, functionality, and economic efficiency in determining reconstruction or remodeling, but they have limitations in some special cases such as the non-association apartment. In this regard, this study was conducted to establish more desirable criteria and procedures in determining reconstruction or new construction and suggests a way to improve policy and laws of reconstruction correctly by reviewing the safety diagnosis in reconstruction process. Besides, the safety diagnosis of reconstruction for non-association apartments in government-owned public district was carried out preemptively to remove reckless procedures. As a result, the reconstruction of non-association apartments should be effectively without interference in the administrative procedures. This requires that the policy and laws of reconstruction safety diagnosis should be revised in priority in order that similar projects in future can be effectively executed.