http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
광역상수도용 펌프의 최적결정을 위한 펌프/모터 선정 프로그램 개발
노형운,김재수,박길문,서상호,이영호,Roh, Hyung-Woon,Kim, Jae-Soo,Park, Gil-Moon,Suh, Sang-Ho,Lee, Young-Ho 한국유체기계학회 2001 한국유체기계학회 논문집 Vol.4 No.4
The pump/motor selection program for optimized selection of regional water supply facilities was developed based on a flowchart compiled from basic operational data, total head requirement, initial pump/motor specification selection etc. This program was developed in Visual Basic. The program accepts, as in the flowchart, operational requirements of pumps and other system requirements, and calculates specific speed based on flow rate, total head and rotational speed. Then the calculated specific speed is used to select pump types and speed prior to determining likelihood of cavitation occurring at the calculated NPSH. Power requirement is then calculated for safe operation of pump to assist final pump selection. Test results of the program match very closely to the design values of Paldang intake pump station(3rd stage) proving that the program can be used as an effective and practical aid for designing new regional water supply systems.
광역상수도 관련 취수장 및 가압장의 운영자료 조사 및 분석
노형운,박종문,이영범,이영호 한국유체기계학회 2002 한국유체기계학회 논문집 Vol.5 No.2
운영 자료의 조사$\cdot$분석을 위해 수도권 광역상수도의 취수장, 가압장 및 정수장들을 발문하여 각 펌프장에서 관리하고 있는 운전일보, 기기이력카드 등과 한국수자원공사에서 발간하는 월보 및 년보와 각 단계별 실시설계 보고서 및 준공도소를 수집하여 통계 처리한 결과를 요약하여 보면 다음과 같다. 각 단계별 수도권 광역상수도의 취수량 및 송수량은 운영을 시작한 초기부터 1990년까지 증가하다가 점점 수량이 감소하는 추세이다. 팔당 1 취수펌프장은 계획 취수량의 $95.5\%$, 2 취수펌프장은 $89.8\%$를 공급한 후 계속 감소되었고 설계 시 $100\%$의 용수량을 만족시키지 못하고 있다. 이러한 현상은 최근 IMF로 인하여 건설경기 둔화와 용수 수요량이 감소하였을뿐만 아니라 지방자치단체별로 취수펌프장을 독자적으로 건설하여 수요량 감소가 심화되었기 때문인 것으로 판단된다. 각 단계별 광역상수도 중 펌프의 운전토출압력과 운전흡입압력으로 부터 전양정을 계산하여 보면 설계된정격양정보다 낮은 수치인 저양정$\cdot$대유량으로 운전되고 있음을 알 수 있다. 이러한 운전은 캐비테이션을 발생시키고 이로 인하여 임펠러에 침식이나 균열이 발생하여 10년에 한번씩은 임페러를 교체한 것으로 나타났다. 그리고 펌프의 교체 주기는 $15\~20$년인 것으로 조사되었다.