RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제
      • 좁혀본 항목 보기순서

        • 원문유무
        • 원문제공처
          펼치기
        • 등재정보
          펼치기
        • 학술지명
          펼치기
        • 주제분류
          펼치기
        • 발행연도
          펼치기
        • 작성언어
        • 저자
          펼치기

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • KCI등재

        NATM 터널의 리스크 관리 시스템 개발 및 현장적용

        정희영,이강현,김병규,이인모,최항석 사단법인 한국터널지하공간학회 2020 한국터널지하공간학회논문집 Vol.22 No.2

        In this paper, a risk management system applicable to NATM tunneling projects is proposed. After investigating case histories in NATM tunnel collapse, this paper analyzes the potential risk factors and their corresponding risk events during NATM tunnel construction. The risk factors are categorized into three groups: geological, design and construction risk factors. The risk events are also categorized into four types: excessive deformation, excessive deformation with subsidence, collapse inside tunnels, and collapse inside tunnels with subsidence. The paper identifies risk scenarios in consideration of the risk factors and proposes a risk analysis/evaluation method for the NATM tunnel risk scenarios. Based on the evaluation results, the optimal mitigation measure to handle the risk events is suggested. In order to effectively facilitate a series of risk management processes, it is necessary to develop a risk register and a management ledger for risk mitigation measures that are customized to NATM tunnels. Lastly, the risk management for an actual NATM tunnel construction site is performed to verify the validity of the proposed system. 본 논문의 목적은 NATM 터널에 적용 가능한 리스크 관리 시스템을 구축하는 것이다. 이를 위해 먼저 NATM 터널 현장의 붕괴 사례를 조사하고, 이를 바탕으로 NATM 터널시공 중 발생 가능한 리스크 사건과 그 발생원인인 리스크 요인을 분석하였다. 리스크 요인은 지질, 설계, 시공 리스크 요인의 세 가지 카테고리로 구분하여 분석하였고, 리스크 사건은 과 대변형, 과대변형 및 지표침하, 터널내부 붕락, 붕락 및 지표침하/함몰의 네 가지 유형으로 분석하였다. 또한, 리스크 요인으로부터 리스크 사건이 발생하는 일련의 리스크 시나리오를 리스크 요인별로 식별하였으며, 해당 NATM 터널 리스크 시나리오에 대한 리스크 분석 및 평가 방안을 제시하였다. 평가결과에 따라 리스크 대응이 필요한 시나리오에 대해 최적의 리스크 저감 대책공법을 선정하는 방안을 제시하였고, 일련의 NATM 터널 리스크 관리 프로세스를 효과적으로 수행할 수 있도록 NATM 터널 리스크 등록부 및 대책공법 관리대장을 개발하였다. 또한, 구축한 리스크 관리 시스템을 실제 도로터널 프로젝트에 적용하여 리스크 식별, 분석 및 평가, 대응 과정을 수행함으로써 그 타당성을 검증하였다.

      • KCI등재

        Soil Conditioning of Weathered Granite Soil used for EPB Shield TBM: A Laboratory Scale Study

        김태환,김병규,이강현,이인모 대한토목학회 2019 KSCE JOURNAL OF CIVIL ENGINEERING Vol.23 No.4

        Soil conditioning is one of the key factors for successfully excavating tunnels by utilizing the Earth Pressure-Balanced (EPB) shield Tunnel Boring Machine (TBM) for increasing the tunnel face stability and extraction efficiency of the excavated soils. Since the characteristics of weathered granite soil, abundant in the Korean peninsula (also in Japan, Hongkong and Singapore), is different from those of either sand or clay, conditioning agents applicable to either sand or clay cannot be directly used for the weathered granite soil. In this study, conditioning agents are mixed with the weathered granite soils and the properties of the resulting mixture are evaluated in a laboratory-scale experiment to derive and propose the most suitable conditioning agent as well as the most appropriate agent mix ratios. It was confirmed through an experimental study that the EPB shield TBM could be operated in good condition by injecting 22–67% foam depending on the water content of the excavated soils. In addition, it was also found that the range of particle size gradation of the weathered granite soils, under which the conditioning agent foam can be applicable, is wider than the existing application ranges proposed thus far for properly operating the EPB shield TBM.

      • KCI등재

        해수가 슬러리 쉴드 TBM 공법 적용성에 미치는 영향

        유영무,김해만,김도형,이인모 사단법인 한국터널지하공간학회 2019 한국터널지하공간학회논문집 Vol.21 No.2

        Formation of filter cake with little slurry penetration into the tunnel face ground is an essential factor to successfully apply the slurry shield tunnel boring machine (TBM) for tunnelling work. However, when the bentonite slurry is in contact with seawater, it is not easy to guarantee the filter cake formation due to decrease of the swelling volume and viscosity of the slurry. In this study, in order to evaluate the effect of the seawater on the applicability of the slurry shield TBM method, the slurry injection tests were carried out with the variation of seawater percentage contained in the slurry samples as well as the variation of soil types. And then, the effect of these two factors on the slurry clogging phenomena was theoretically and experimentally figure out. As a result, it was found that the value of the slurry clogging criteria (SCC) indicating the applicability of the slurry shield TBM significantly decreases up to 67% as the percentage of seawater increases from 0% up to 20%. In addition, it was found to be necessary to take into account both the characteristics of slurry and soil types together when judging the applicability of the slurry shield TBM method by assessing the slurry penetration characteristics that will occur during tunnelling work. 슬러리 쉴드 TBM (Slurry shield TBM) 공법에서 벤토나이트 슬러리의 침투와 필터 케이크의 형성 여부는 공법의 적용성에 영향을 미치는 중요한 요소이다. 그러나 벤토나이트 슬러리는 해수와 접촉하였을 때 팽윤성과 점도가 저하되어 공법에 대한 적용성을 확보하기 어렵다. 본 연구에서는 해수의 영향에 따른 슬러리 쉴드 TBM 공법의 적용성 변화를 평가하기 위해 슬러리의 해수 비율을 다르게 하여 주입 실험을수행하였고 해수가 슬러리의 폐색 현상에 미치는 영향을 확인하였다. 그 결과, 해수의 비율이 0%에서 20%까지 증가할수록 폐색 효과에 의한 슬러리 쉴드 TBM 공법의 적용성을 나타내는 slurry clogging criteria (SCC)가 최대 67%까지도감소하는 것을 확인하였다. 또한 슬러리의 물리적 성질이 동일함에도 지반 조건에 따라 SCC값이 공법 적용에 문제가 없는 수준에서 공법 적용을 위해 슬러리에 추가적인 처리를 요하는 수준으로 변화하는 것을 통해 슬러리 쉴드 TBM의 적용성을 평가할 때 슬러리의 특성뿐만 아니라 지반 조건에 대한 고려도 필요함을 입증하였다.

      • KCI등재

        Slurry Clogging Criteria for Slurry Shield Tunnelling in Highly Permeable Ground

        유영무,권영삼,김태환,이인모 대한토목학회 2019 KSCE JOURNAL OF CIVIL ENGINEERING Vol.23 No.6

        When tunnelling using a slurry shield tunnel boring machine (slurry shield TBM), the tunnel face stability is significantly influenced by the filter cake formation during slurry injection to the chamber. In order to study slurry penetration behavior in highly permeable ground, comprehensive slurry injection tests were performed by varying the particle size distribution of the ground, the bentonite content and viscosity, and the slurry injection pressure. According to the results of these tests, the slurry penetration behavior could be classified into three types: Type A, denoting negligible slurry penetration; Type C, denoting excessive penetration; and Type B, denoting in-between penetration. Slurry clogging criteria (SCC) were proposed to classify these three types. The main superiority of the proposed SCC is that it can consider the grain size distribution of the ground, the characteristics of the slurry, and the slurry injection pressure together when assessing the penetration characteristics. The SCC value can either be obtained by performing a simple slurry penetration test; or it can be theoretically estimated by using the regression equation proposed in this paper.

      • KCI등재

        An ANN to Predict Ground Condition ahead of Tunnel Face using TBM Operational Data

        정지희,정희영,권영삼,이인모 대한토목학회 2019 KSCE JOURNAL OF CIVIL ENGINEERING Vol.23 No.7

        This paper presents an artificial neural network (ANN) model that predicts ground conditions ahead of a tunnel face by using shield tunnel boring machine (TBM) data obtained during the tunneling operation. The primary advantage of the proposed technique is that, by using TBM data, no additional data acquisition device is required. Ground type classifications and machine data normalization methods are introduced to maintain the consistency of the measured data and improve prediction accuracy. The efficacy of the proposed model is demonstrated by its 96% accuracy in predicting ground type one ring ahead of the tunnel face.

      • KCI등재

        종방향균열 영향인자 분석을 통한 NATM터널 정밀안전진단 상태평가 항목의 재검토

        추진호,유창균,오영철,이인모 사단법인 한국터널지하공간학회 2019 한국터널지하공간학회논문집 Vol.21 No.4

        State assessment of an operational tunnel is usually done by performing visual inspection and durability tests by following the detailed guideline for safety inspection (SI) and/ or precision inspection for safety and diagnosis (PISD). In this study, 12 NATM tunnels, which have been operational for more than 10 years, were inspected to figure out the cause of longitudinal cracks for the purpose of modifying the scoring items in the state assessment NATM tunnel related to the longitudinal crack and the thickness of concrete lining. All investigated tunnels were classified into four groups depending on the shape and usage of each tunnel. The causes of longitudinal crack occurrence were analyzed by investigating the correlations between the longitudinal crack and the following four factors: the patterns of ground excavation; construction state of primary support system; characteristics of material properties of the concrete lining; and thickness of lining which was obtained by Ground Penetration Radar (GPR) tests. It was found that influencing factors causing longitudinal cracks in the lining were closely related with the construction condition of the primary support system, i.e. shotcrete, rockbolt, and steel-rib; crack occurrences were not much affected by the excavation patterns. As for the properties of concrete lining materials, occurrence of the longitudinal crack was mostly affected by the following three items: w/c ratio; contents of cement; and strength of lining. When estimating the lining thickness of the concrete lining by GPR tests and taking thickness effect into account in the statement assessment, it was concluded that increase of the index score by an average of 0.03 (ranging from 0.01 up to 0.071) is needed; a more realistic way of state assessment should be proposed in which the increased index score caused by lack of lining thickness should be taken into account. 공용중인 터널의 조사 및 평가는 시설물안전법의 안전점검 및 정밀안전진단 세부지침(터널)편에 따라 외관조사와 내구성조사를 근거하여 상태평가를 수행하고 있다. 본 연구에서는 종방향균열의 발생요인 파악을 위해 준공 후 10년이 경과되어 최초 정밀안전진단이 실시된 NATM터널 12개에 대해 균열과 라이닝의 두께를 검토하여, 이를 반영한 상태평가 수정사항을 모색하였다. 종방향균열에 대한 굴착지반의 영향을 검토하기 위해 지보패턴, 이를 구성하는 지보재 시공 조건, 라이닝의 재료적 특성, GPR탐사를 통한 라이닝 두께 등을 터널 형상 및 용도에 따라 4개의 그룹으로 나누어 자료를 분석하였다. 균열발생밀도는 숏크리트, 록볼트, 강지보재의 지보재 지지능력에 따라 변화되나 굴착지보패턴에 따른 균열발생과의 연관성은 낮은 것으로 나타났다. 라이닝 재료적인 특징인 물-시멘트비, 시멘트함유량, 강도 등이 균열발생에 영향을 주는 것으로 나타났다. 또한, GPR탐사의 라이닝 두께를 반영한 상태평가에서는 평균 0.03 정도(분포, 0.001~0.071) 의 점수증가를 야기하는 것으로 확인되어 향후 라이닝 두께 부족을 고려하는 현실적인 상태평가 방안에 대한 검토가 필요하다.

      • KCI등재

        정밀안전진단 결과를 활용한 NATM (철근)의라이닝 결함 종류별 발생원인 및 분석 - Part I

        추진호,이인모 사단법인 한국터널지하공간학회 2019 한국터널지하공간학회논문집 Vol.21 No.1

        NATM (무근)터널의 라이닝 균열을 분석한 논문과 연계하여 NATM (철근)터널의 결함을 정밀안전진단 사례를 정리하여 결함별 원인을 분석하고자 하였다. NATM (철근)터널에서 콘크리트라이닝은 그 역할에 따라 철근과 같은 보강재를사용하게 된다. 지반이 불량하거나 안전성 확보를 위한 라이닝 두께의 증가는 굴착단면의 증가와 라이닝 타설 물량의 증가를 유발하나, 철근보강 단면을 설계하여 경제성과 안전성을 함께 도모하게 된다. 시설물안전법에 의한 국내 1종 터널시설물 중에서 NATM으로 시공된 구간에 철근보강을 실시한 라이닝의 결함 특성을 정리하여 형태별 발생원인을 분석하고자 하였다. 단철근, 복철근과 무근라이닝에 발생되는 균열을 비교하여 철근으로 인한 균열제어 효과를 분석하였다. 다양한 위치에서의 철근노출 사례와 함께 기술하였고 터널에서 고려될 수 있는 라이닝 두께 부족의 원인으로 정밀시공미흡, 박락, 공용중 라이닝 화재에 의한 폭열, 지진, 용탈의 사례를 기존 연구와 비교하여 분석하였다. 향후 본 연구를 통해 정밀안전진단(터널) 세부지침의 보완 및 개정방향 등을 제시하고자 한다. Related to the previous paper on the typical crack pattern of tunnel lining with NATM, the characteristic defects in reinforced cement concrete lining of NATM tunnel have analyzed with the precise inspection with safety and diagnosis (PISD) by KISTEC. Depending on the reinforcing materials, steel rebar, steel fiber, and glass fiber have been implemented to reinforcing lining in various NATM tunnel constructions. Reinforcing lining with rebar are prevailed on NATM tunnel to countermeasure the weak geological circumstances, to pursuit the economical tunnel sections, and to resist the risk of tunnel deterioration. By the special act on the safety control of public facilities, the reinforced NATM tunnels for more than 1 km length are scrutinized closely to characterize defects; crack, reinforcement exposure, and lack of lining. Crack resistance by reinforcing is shown in comparison with the normalized crack to the length of tunnel. Typical exposed reinforcements in lining have exemplified with various sections. The lack of lining due to the mal-construction, spalling, fire, earthquake and leaching has been analyzed. The cause and mechanism with the field inspections and other studies has also been verified. Detailed cases are selected by the above concerns as well as the basic information from FMS (Facilities Management System). Likewise the previous paper, this study provides specialized defects in reinforced lining of NATM and it can be widely used in spreading the essential technics and reporting skills. Furthermore, it would be advised and amended for the detail guideline of Safety Diagnosis and PISD (tunnel).

      • KCI등재

        RMR과 암석종류가 터널 천공속도에 미치는 영향

        김해만,이인모,홍창호 사단법인 한국터널지하공간학회 2019 한국터널지하공간학회논문집 Vol.21 No.4

        Drilling and charging of the blast holes during NATM tunneling works take more than 30% of construction time among the whole tunneling work process. Prediction of ground condition ahead of tunnel face has been studied by several researchers by correlating percussion pressure and drilling speed during tunneling work with the ground condition and/or RMR values. However, most of the previous researches were conducted in the granite rock condition which is the most representative igneous rock in the Korean peninsula. In this study, drilling speeds in igneous rocks were analyzed and compared with those in sedimentary rocks (most dominantly composed of conglomerates, sandstones, and shales) under the similar RMR ranges; it was identified that the drilling speed is pretty much affected by rock types even in a similar RMR range. Under the similar RMR values, the drilling speed was faster in sedimentary rocks compared with that in igneous rock. Moreover, while the drilling speed was not much affected by change of the RMR values in igneous rocks, it became faster in sedimentary rocks as the RMR values got lower. NATM 공법을 이용한 터널굴착 시 발파공 천공 및 장약 작업은 전체 터널 굴착 시간의30% 이상을 차지하는 중요한 과정이다. 최근에는 이 공정을 활용하여 천공작업 도중 얻어지는 타격압, 천공속도 등을 바탕으로 터널 굴착면 전방의 지반상태, RMR 등을 예측하는 연구들이 진행되어 왔다. 하지만 선행 연구들은 대부분 화강암으로 대표되는 화성암질 지반에 대해서만 수행되어왔다. 본 연구에서는 유사한 RMR의 범위를 가지는 화성암의 천공속도를 퇴적암(특히, 역암, 사암 및 셰일)의 천공속도와 비교/분석하였으며, 유사한 RMR 값을 가지는 암이라 하더라도 암질 종류에 따라서 천공속도가 크게 달라질 수 있음을 확인하였다. 퇴적암에서의 천공속도가 화성암에서의 속도보다 더 빨랐으며, 또한 화성암의 경우 천공속도와 RMR등급에 따른 천공속도의 차이는 거의 없는 것에 반하여, 퇴적암의 경우는 RMR등급이 낮아질수록 천공속도는 증가함을 알수 있었다.

      • KCI등재

        Mechanical Behavior of Hybrid Soil Nail-Anchor System

        서형준,이인모,류영무,정지희 대한토목학회 2019 KSCE JOURNAL OF CIVIL ENGINEERING Vol.23 No.10

        Prestressed soil-nail system has two reinforcing components: steel bar and PC strands. The steel bar with relatively less elongation yields earlier than PC strands. Thus, yield displacements of these two components should be matched to maximize the design load (capacity) of prestressed soil-nail. To achieve this, PC strands need to be prestressed before applying pullout load. In this study, load transfer mechanisms of soil-nail and prestressed soil-nail were determined based on skin friction theory and load transfer theory. The load transfer was derived analytically based on the assumption that skin friction at the interface was fully mobilized. It was then compared with results from field pullout tests performed to identify in-situ load transfer mechanism. Additionally, optimum prestress level required to maximize the pullout loading capacity was evaluated and compared with those obtained from field tests.

      • KCI등재

        전기비저항과 유도분극을 활용한 TBM 터널 굴착면 전방 토사지반 및 핵석지반 예측 기법

        강대훈,이인모,정지희,김도형 사단법인 한국터널지하공간학회 2019 한국터널지하공간학회논문집 Vol.21 No.3

        It is essential to predict ground conditions ahead of a tunnel face in order to successfully excavate tunnels using a shield TBM. This study proposes a forward prediction method for a mixed soil ground and/or a ground containing core stones by using electrical resistivity and induced polarization exploration. Soil conditioning in EPB shield TBM is dependent upon the composition of mixed soils; a special care need to be taken when excavating the core-stoned soil ground using TBM. The resistivity and chargeability are assumed to be measured with four electrodes at the tunnel face, whenever the excavation is stopped to assemble one ring of a segment lining. Firstly, the mixed ground consisting of weathered granite soil, sand, and clay was modeled in laboratory-scale experiments. Experimental results show that the measured electrical resistivity considerably coincides with the analytical solution. On the other hand, the induced polarization has either same or opposite trend with the measured resistivity depending on the mixed ground conditions. Based on these experimental results, a method to predict the mixed soil ground that can be used during TBM tunnel driving is suggested. Secondly, tunnel excavation from a homogeneous ground to a ground containing core stones was modeled in laboratory scale; the irregularity of the core stones contained in the soil layer was modeled through random number generation scheme. Experimental results show that as the TBM approaches the ground that contains core stones, the electrical resistivity increases and the induced polarization fluctuates. 토사지반과 핵석지반에서 EPB 쉴드 TBM을 통한 성공적인 터널 시공을 위해서 굴착면 전방의 지반 정보를 정확히 파악하는 것이 필요하다. 본 연구에서는 전기비저항 탐사와 유도분극(induced polarization) 탐사를 함께 활용하여 복합토사지반과 핵석지반에 대한 전방 예측 방안을 제시하고자 하였다. 토사지반의 구성은 EPB 쉴드 TBM에서 첨가재 선택에필수요소이며, 핵석지반은 기계화 시공에서 난이도가 높은 지반이기 때문이다. 탐사는 TBM이 굴진을 멈추고 세그먼트1링을 조립할 시에 커터헤드에 설치된 4개의 전극을 활용하여 수행된다고 보았다. 토사지반의 경우 화강풍화토, 모래, 점토로 구성된 복합지반에 대해 축소모사하여 실내실험을 수행하였다. 실험 결과 전기비저항은 복합지반 이론해와 상당히 일치하였으며 유도분극은 경우에 따라 전기비저항과 경향성이 일치하거나 완전히 상반되었다. 이러한 결과를 토대로 실제 현장에서 적용 가능한 토사지반 예측방안을 제시하였다. 핵석지반의 경우 균질지반에서 핵석지반으로 굴착해나가는 상황을 축소모사하였으며 핵석의 불규칙성을 난수를 통해 모사하였다. 실험결과 전기비저항은 핵석지반에 접근할수록 증가하였고 유도분극은 불규칙하게 오르내림을 거듭하는 경향을 나타내었다.

      • KCI등재

        토사터널의 쉴드 TBM 데이터 시계열 분석을 통한 막장 전방 예측 연구

        정지희,김병규,정희영,김해만,이인모 사단법인 한국터널지하공간학회 2019 한국터널지하공간학회논문집 Vol.21 No.2

        This paper presents a method to predict ground types ahead of a tunnel face utilizing operational data of the earth pressure-balanced (EPB) shield tunnel boring machine (TBM) when running through soil ground. The time series analysis model which was applicable to predict the mixed ground composed of soils and rocks was modified to be applicable to soil tunnels. Using the modified model, the feasibility on the choice of the soil conditioning materials dependent upon soil types was studied. To do this, a self-organizing map (SOM) clustering was performed. Firstly, it was confirmed that the ground types should be classified based on the percentage of 35% passing through the #200 sieve. Then, the possibility of predicting the ground types by employing the modified model, in which the TBM operational data were analyzed, was studied. The efficacy of the modified model is demonstrated by its 98% accuracy in predicting ground types ten rings ahead of the tunnel face. Especially, the average prediction accuracy was approximately 93% in areas where ground type variations occur. 토압식(Earth Pressure-Balanced, EPB) 쉴드 TBM 기계데이터 분석을 통해 토사터널의 특징이 반영된 막장 전방 예측방법을 제안하였다. 기존에 암반과 토사가 혼합된 복합 지반의 예측에 적용하였던 시계열 분석 모델을 토사터널에 적용가능하도록 수정하였다. 또한 수정된 모델을 사용하여, 토사 종류에 따라 쏘일 컨디셔닝 재료를 선택하는 것이 타당한지연구하였다. 이를 위해 Self-Organizing Map (SOM) 군집화(clustering) 분석을 수행하였다. 그 결과 무엇보다도 지반타입이 #200체 통과량 35% 기준으로 분류되어야 한다는 것을 확인하였다. 또한 TBM 기계데이터 분석을 통해 수정된모델이 지반 타입을 예측하는데 사용될 수 있음을 확인하였다. 수정된 기준에 따라 지반 타입을 분류하고 시계열 분석을수행하면, 10막장 전방 지반에 대해서 98%의 높은 예측 정확도를 보였으며, 이를 통해 수정된 방법의 우수성이 입증되었다. 특히 지반 타입 변화 구간에 대한 예측 정확도도 약 93%로, 10막장 전방에서 지반 타입 변화 여부를 미리 확인할수 있게 되었다

      • KCI등재

        GPR탐사를 통한 NATM터널(무근)라이닝의 두께 분포 및 배면상태 평가

        추진호,유창균,오영철,이인모 사단법인 한국터널지하공간학회 2019 한국터널지하공간학회논문집 Vol.21 No.5

        본 연구에서는 3개의 공용중인 NATM터널에서 수행된 정밀안전진단 GPR탐사 결과로 라이닝 두께분포 및 배면상태특성을 분석하였다. 라이닝 천장에서 실시한 GPR 자료분석으로 라이닝 콘크리트와 1차지보재 사이에 공간이 대부분존재하는 것으로 분석되었다. 다수의 라이닝 종단탐사로 분석된 횡단 두께의 좌·우 불균형은 8.6~253.5 mm로 확인되었으며 급격한 두께편차 주변에서 종방향균열 발생을 확인하였다. 라이닝 천단 중앙에서 실시된 종단 두께 분포는 3개의적합도 검증을 통해 터널별 최적의 분포함수가 선정되었다. 종방향 라이닝 두께의 평균이 설계기준 이상인 경우 정규분포 및 이와 유사한 분포 특성을 나타내고 있으며, 설계두께 이하의 터널에서는 Gamma, Inverse Gauss분포함수가 해당터널의 라이닝을 대표하기 위한 최적함수로 적합할 것으로 판단하였다. NATM터널(무근) 라이닝의 두께분포는 터널의상태평가 및 안전성평가를 전반적으로 분석하기 위한 중요한 지표가 될 수 있으며, 향후 기존의 일정한 설계 두께를 적용하기 보다는 GPR탐사를 반영한 라이닝의 현실적인 평가 방법의 연구가 필요할 것으로 판단된다. In this study, lining thickness distribution and its behind state (particularly, its void state) were analyzed using the GPR survey data performed on three currently operating NATM tunnels. Results of GPR analysis showed that void areas were mostly detected between concrete lining and primary support, particularly, near the crown of the tunnels. The lining thickness in the left-hand side of the tunnel was different from that of the right-hand side by 8.6~253.5 mm when measured in transverse direction. It was also found that longitudinal cracks were prevailed in the area lining thickness was sharply changed. Longitudinal thickness distribution at the crown was also studied and tested by performing 3 goodness-of-fit tests in order to find the most suitable thickness distribution. Normal distribution (or similar distribution) fit most suitably to the measured data if the measured average thickness was larger than designed one; Gamma and/or Inverse Gauss distribution fit to the measured data reasonably well if the measured average thickness was less than the designed value of thickness. Since actual lining thickness can be a potential index when assessing the state and safety of the unreinforced NATM tunnel lining, measuring of the lining thickness with GPR survey might be needed rather than assuming the thickness is always constant and same with the designed value.

      • KCI등재

        폐색효과를 고려한 사질토의 시멘트 침투 그라우팅 거동 특성

        서종우,이인모,김병규,권영삼,Seo, Jong-Woo,Lee, In-Mo,Kim, Byung-Kyu,Kwon, Young-Sam 한국터널지하공간학회 2018 한국터널지하공간학회논문집 Vol.20 No.2

        사질토에서의 시멘트 침투 그라우팅 거동 특성을 실내 챔버 모형실험 결과를 토대로 흙의 입도분포에 따라 시멘트 침투 그라우팅 불가 영역, 시멘트 침투 그라우팅 가능 영역, 그리고 급결제 혼합 필요 영역으로 구분하였다. 시멘트 침투 그라우팅 가능 영역에서는 대표 간극 반지름의 개념을 제안하였고 사질토에서의 평균 간극 반지름에 대한 대표 간극 반지름의 비를 실내실험 결과와 폐색 이론식을 비교함으로 구할 수 있었으며, 입도분포에 따라 1.07에서 1.35 정도가 됨을 알 수 있었다. 또한 실험 조건 별로 실험결과와 이론식을 비교하여, lumped parameter (${\theta}$)를 흙의 대표 간극 반지름과 시멘트 그라우트재의 물시멘트비로부터 구할 수 있는 관계식을 제안하였다. 급결제 혼합 필요 영역에서는 겔화 시간의 조절을 통한 주입 깊이의 제한과정을 실험적으로 검증하였고 그 실험값이 시간에 따른 점도 변화 함수를 적용한 이론값과 일치하는 것을 확인하였다. The behavior of cement-based permeation grouting is divided into three different groups depending on the grain size distribution of the soils: (1) zone of cement-based permeation grouting not feasible; (2) zone of cement-based permeation grouting feasible; and (3) zone in which an accelerating agent should be added to limit the penetration depth. In the cement-based permeation grouting feasible zone, the concept of a representative pore radius was proposed. The ratios of the representative pore radius to the mean pore radius were obtained by performing laboratory test and comparing with clogging theory; these values were in the range of 1.07 and 1.35 depending on the grain size distribution of the soils. In addition, a functional relationship between the lumped parameter (${\theta}$), the representative pore radius and the w/c ratio were derived by comparing and matching experimental results with predictions from theory. In the zone in which the accelerating agent should be added, the controlling process of gel time to limit the penetration depth was experimentally verified. The test results matched well with those obtained from theory utilizing the developed grout penetration program on condition that the viscosity increasing tendency of grout suspension with time is properly taken into account.

      • KCI등재

        토압식 쉴드 TBM 굴진을 위한 화강풍화토의 컨디셔닝을 평가하는 간편 시험법

        김태환,권영삼,정희영,이인모 사단법인 한국터널지하공간학회 2018 한국터널지하공간학회논문집 Vol.20 No.6

        Soil conditioning is one of the key factors for successfull tunnel excavations utilizing the earth pressure-balanced (EPB) shield tunnel boring machine (TBM) by increasing the tunnel face stability and extraction efficiency of excavated soils. In this study, conditioning agents are mixed with the weathered granite soils which are abundant in the Korean peninsula and the workability of the resulting mixture is evaluated through the slump tests to derive and propose the most suitable conditioning agent as well as the most appropriate agent mix ratios. However, since it is cumbersome to perform the slump tests all the time either in the laboratory or in-situ, a simpler test may be needed instead of the slump test; the fall cone test was proposed as a substitute. In this paper, the correlation between the slump value obtained from the slump test and the cone penetration depth obtained from the proposed fall cone test was obtained. Test results showed that a very good correlation between two was observed; it means that the simpler fall cone test can be used to assess the suitability of the conditioned soils instead of the more cumbersome slump test. 토압식(Earth Pressure Balanced, EPB) 쉴드 TBM 굴착에서 첨가제 사용을 통해 막장안정과 배토효율을 증대시키며, 토사지반에의 적용범위를 확대시킬 수 있다. 첨가제로배합된 굴착토사는 배합 전과 그 거동을 달리하는데, 일반적으로 워커빌리티를 평가하여 비교할 수 있다. 본 연구에서는 국내 화강풍화토와 첨가제를 배합한 후 슬럼프 시험을 통해 워커빌리티를 평가하고, 적절한 배합비를 도출하고자 하였는바, 매 경우마다 슬럼프 시험을 실시하는 것이 많은노력을 요하므로 실내 혹은 현장에서 슬럼프 시험보다 간편한 시험법이 필요하다고 판단되어 대체 실험으로서 낙하 콘시험을 고안하였다. 같은 시료에 대하여 슬럼프 시험에 의한 슬럼프 치와 낙하 콘 시험에서의 콘 관입깊이와의 상관관계를 구한 결과 매우 상관성이 높음을 알 수 있었다. 따라서 국내에 편재해있는 화강풍화토에 대한 쏘일 컨디셔닝의 평가에핵심인 슬럼프 치 대신 낙하 콘 시험을 이용할 수 있는 관계식을 제안하였다.

      • KCI등재

        Comparison of the adjuvanticity of two adjuvant formulations containing de-O-acylated lipooligosaccharide on Japanese encephalitis vaccine in mice

        고아라,위서리,Ji In Ryu,Hien Thi Thu Do,이연정,임수정,이인모,정대인,박진아,최정아,송만기,이나경 대한약학회 2018 Archives of Pharmacal Research Vol.41 No.2

        Adjuvants are essential vaccine componentsused to enhance, accelerate, and/or prolong adaptiveimmunity against specific vaccine antigens. In this study,we compared the adjuvanticity of two adjuvant formulationscontaining de-O-acylated lipooligosaccharide(dLOS), a toll-like receptor 4 agonist, on the Japaneseencephalitis (JE) vaccine in mice. Mice were immunizedonce or twice at a two-week interval with inactivated JEvaccine in the absence or presence of adjuvant. We foundthat both the alum- and the liposome-based formulationinduced significantly faster and higher serum IgG antibodyresponses as compared with the non-adjuvanted vaccineafter either one or two immunizations. The antibody titersof the mouse immune sera correlated with 50% plaquereduction neutralization test (PRNT50) antibody titers. Inaddition, the dLOS/liposome formulation was more effectivein inducing a Th1-type immune response than thedLOS/alum formulation, as suggested by a strong antigenspecificinterferon (IFN)-c response. Based on theseresults, we suggest that both alum- and liposome-basedadjuvant formulations containing dLOS may be used forthe development of JE vaccines with improvedimmunogenicity.

      • KCI등재

        TBM 현장에서 전기비저항 탐사의 적용성에 관한 연구

        이강현(Kang-Hyun Lee),박진호(Jin-Ho Park),박지호(Jiho Park),이인모(In-Mo Lee) 한국지반환경공학회 2018 한국지반환경공학회논문집 Vol.19 No.3

        터널을 굴착할 때 터널 막장 전방의 지반 상태를 예측하는 것은 중요하다. 따라서 국내외에서 TBM 현장에 적용 가능한 터널 막장 전방의 지반조건을 예측할 수 있는 기법에 대한 다양한 연구가 수행되었다. 본 연구에서는 TBM 현장에서 적용되는 막장전방 예측기법에 대한 사례를 조사하였다. TBM 현장에서 필요한 막장전방 예측기법과 탐사심도에 대한 요구사항을 결정하기 위하여 10년 경력 이상의 TBM 오퍼레이터들을 대상으로 설문조사를 수행하였다. 설문조사 결과를 바탕으로 TBM 현장에 적용 가능한 막장전방 예측기법들을 제안하였다. 그중 TBM 현장에 적용 가능한 막장전방 예측기법 중 한 가지는 커터헤드에 위치한 디스크 커터를 전극으로 이용하여 전기비저항 탐사를 수행하는 것이다. 따라서 본 연구에서는 TBM 현장에서 전기비저항 탐사를 통한 막장 전방 예측기법의 적용성을 평가하기 위해 실내 시험을 수행하였다. 그 결과, TBM 직경의 0.3배까지 막장 전방의 지반상태를 예측할 수 있는 것으로 나타났다. It is essential to predict ground conditions ahead of the tunnel face during tunnel excavation. Various studies on tunnel prediction method of the ground condition ahead of the tunnel face have already been done and applied to in mechanized tunnelling job sites. So, all the methods used in mechanized tunnelling to predict ground conditions ahead of the tunnel face were reviewed. A questionnaire surveying Tunnel Boring Machine (TBM) operators with at least 10 years’ experience in TBM operation was used to determine the requirements for prediction methods as well as the distance from the tunnel face that must be assessed. Based on the result of questionnaire survey, the most feasible prediction methods applicable to mechanized tunnelling job-sites are suggested. One of the prediction methods applicable to mechanized tunnelling job-sites might be the electrical resistivity survey by utilizing the disk cutter on the cutterhead as electrode. So, in this study, laboratory tests were performed to evaluate the feasibility of prediction method utilizing electrical resistivity survey at mechanized tunnelling job-sites. It was found that geological condition ahead of 0.3 times of TBM’s diameter from tunnel face could be predicted.

      • KCI등재

        전기비저항과 유도분극을 활용한 TBM 터널 굴착면 전방 복합지반 예측 기법

        류진우,박진호,이성원,이인모,김병규,Ryu, Jinwoo,Park, Jinho,Lee, Seong-Won,Lee, In-Mo,Kim, Byung-Kyu 한국터널지하공간학회 2018 한국터널지하공간학회논문집 Vol.20 No.1

        본 연구에서는 시공 중 TBM 터널에서 전기비저항과 유도분극(induced polarization, IP) 탐사를 활용하여 굴착면 전방의 복합지반(mixed-ground)을 예측하기 위한 방안을 제시하였다. TBM이 토사를 굴진하며, 굴착면 전방에서 상부 토사지반과 하부 암반으로 이루어진 복합지반을 조우하는 과정과 동시에 전기비저항과 유도분극에 의한 충전성(chargeability)을 측정하며 굴진하는 과정을 실내실험으로 모사하였다. 전기비저항과 충전성의 측정은 4전극을 이용하였으며, 복합지반을 효과적으로 예측하기 위하여 2개의 전극은 굴착면에, 나머지 2개의 전극은 조립된 세그먼트에 설치됨을 가정하였다. 실험 결과, TBM이 토사 굴진 중 토사-암반의 복합지반으로 진입할 경우 전기비저항과 충전성이 모두 증가하였다. 또한, TBM이 굴착면 전방에서 복합지반을 조우할 것임을 예측하기 위하여 굴착면의 전극 2개, 세그먼트의 전극 2개를 활용한 탐사와 동시에 굴착면 4전극 탐사를 수행하면 더욱 효과적인 예측이 가능함을 확인하였다. A method that can predict the mixed-ground condition ahead of a TBM tunnel face during tunnel construction utilizing electrical resistivity and induced polarization (IP) was proposed in this study. Effect of TBM advancement approaching the mixed-ground condition (composed of soil layer overlying rock layer) when currently running through soil zone on the electrical resistivity and IP measuring was assessed with laboratory-scale experiments. The resistivity and IP values were measured using four electrodes, by installing two electrodes on the tunnel face (at the cutterhead), and the other two electrodes on the segment lining. The test results showed that both of the measured resistivity and IP values were kept increasing as the TBM is approaching the soil-rock mixed-ground. Also, to get the more reliable results for predicting the mixed-ground condition, it was recommended that the measurement is made at the tunnel face utilizing 4-electrodes installed at the cutterhead as well as it is made utilizing the 2-electrodes installed at the segment lining along with the 2-electrodes installed on the tunnel face (at the cutterhead) so that two measured results are compared each other.

      • KCI등재

        Cement-Based Fracture Grouting Phenomenon of Weathered Granite Soil

        윤주원,박정준,권영삼,김병규,이인모 대한토목학회 2017 KSCE JOURNAL OF CIVIL ENGINEERING Vol.21 No.1

        The injection process of fracture grouting and/or fracture-permeation grouting is studied in this paper and analytical solutions are proposed to determine the fracture initiation pressure, the fracture length and thickness, and the pressure-induced filtration phenomenon for weathered granite soil, which is the most abundant soil type on the Korean peninsula. A theory is proposed and then verified through laboratory chamber tests. Experimental results show that fracture grouting occurs in unsaturated weathered granite soil, while fracture-permeation grouting occurs in saturated weathered granite soil. Also, through the experimental results with unsaturated weathered granite soil, it was found that the filtration phenomenon occurs when the water-cement ratio of the grout is less than 1.25. We were also able to demonstrate that the fracture initiation pressure as well as the fracture length and thickness obtained from the experiments match reasonably well with the theoretical values obtained from the analytical solutions.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼