http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
154kV 디지털변전소 준공을 위한 엔지니어링 및 수행결과 분석에 관한 연구
이유진,한정열,최종기,이남호,Lee, You-Jin,Han, Jeong-Yeol,Choi, Jong-Kee,Lee, Nam-Ho 한국조명전기설비학회 2016 조명·전기설비학회논문지 Vol.30 No.12
In June 2013, 154kV digital substation based on IEC61850 was established for the first time in South Korea. In 2016, digital substation of about 26 plants have operated all over the nation. A new technology called IEC61850-based substation automation successfully applied to a real system. Since the early 2000s, to apply a new technology called IEC61850-based substation automation successfully to a real system, we (KEPCO) have been developing the engineering and performance verification technology related to fields. In this paper, we illustrate our engineering experience with the contents of the analysis and verification results, also various field problems that have occurred in the field during the past years. Finally we suggest a useful information that can be considered when the new substation is installed.
154㎸ 디지털변전소 준공을 위한 엔지니어링 및 수행결과 분석에 관한 연구
이유진(You-Jin Lee),한정열(Jeong-Yeol Han),최종기(Jong-Kee Choi),이남호(Nam-Ho Lee) 한국조명·전기설비학회 2016 조명·전기설비학회논문지 Vol.30 No.12
In June 2013, 154㎸ digital substation based on IEC61850 was established for the first time in South Korea. In 2016, digital substation of about 26 plants have operated all over the nation. A new technology called IEC61850-based substation automation successfully applied to a real system. Since the early 2000s, to apply a new technology called IEC61850-based substation automation successfully to a real system, we (KEPCO) have been developing the engineering and performance verification technology related to fields. In this paper, we illustrate our engineering experience with the contents of the analysis and verification results, also various field problems that have occurred in the field during the past years. Finally we suggest a useful information that can be considered when the new substation is installed.