RISS 학술연구정보서비스

검색
다국어 입력

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

변환된 중국어를 복사하여 사용하시면 됩니다.

예시)
  • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
  • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
닫기
    인기검색어 순위 펼치기

    RISS 인기검색어

      검색결과 좁혀 보기

      선택해제
      • 좁혀본 항목 보기순서

        • 원문유무
        • 원문제공처
          펼치기
        • 등재정보
        • 학술지명
          펼치기
        • 주제분류
          펼치기
        • 발행연도
          펼치기
        • 작성언어
        • 저자
          펼치기

      오늘 본 자료

      • 오늘 본 자료가 없습니다.
      더보기
      • 무료
      • 기관 내 무료
      • 유료
      • KCI등재

        초고층건물 R/C조 코어월 선행공사의 시공계획 실무에 관한 분석

        안병주,Ahn Byung-Ju 한국건설관리학회 2004 건설관리 : 한국건설관리학회 학회지 Vol.5 No.2

        Core-wall construction method is applied in many high-rise building constructions. This is caused by the advantages of the method such as the effect of saved construction cost and shortened period. However, the analysis study of planning practice for core-wall construction shows matters take place during core-wall construction, such as increasing in construction cost and period. These matters result from the limited work space leading to low productivity, the activity interference leading to increasing in period, additional temporary work cost and time, and delayed concrete pour activity. A large part of these can be prevented taking place by very detailed and most careful core-wall construction plan. Therefore, this study suggests improvement directions of core-wall construction planning process focused on the cooperation system of a contractor between a sub-contractor and the process. 코어월 선행공사는 공기단축, 비용 절감 효과 등과 같은 이점 등으로 인하여 국내 초고층건물공사에서 널리 적용되고 있다. 그러나 본 연구에서 수행한 사례조사연구에 따르면 초고층건물 코어월 선행공사 수행 과정에서 작업 공간 및 작업 동선 등의 미확보로 인한 생산성 저하, 코어월 선행공사의 세부 작업 및 양중장비 등의 작업 간섭으로 인한 공기 지연, 추가 가설 공사 및 비용 발생, 콘크리트 타설 작업의 지연 등으로 인한 공사비 증가와 공기 지 연 등의 문제가 발생하고 있었다. 이러한 문제의 발생원인을 분석한 결과, 시공계획 과정에서 좀더 치밀하고 세심한 주의를 기울여서 계획을 수립하고 공사에 임했을 경우, 이것들의 상당수는 발생을 미연에 방지할 수 있음을 알 수 있었다. 이에 본 연구에서는 이러한 문제점들을 해결하기 위한 기초 단계로서 시공계획 과정에서의 도급자와 하도급자간의 협력체계 개선 방향과 시공계획 과정의 개선 방향 등을 제안하였다.

      • KCI등재

        이산형 시뮬레이션을 사용한 초고층건물공사 작업원의 수직이동계획

        안병주,Ahn Byung-Ju 한국건설관리학회 2004 건설관리 : 한국건설관리학회 학회지 Vol.5 No.2

        최근 수년 동안에 국내에서는 많은 초고층건물들이 완공되었다. 지금도 다수의 초고층건물들이 시공되고 있으며, 심지어 100층 이상 규모의 초고층건물까지도 기획 중에 있다. 이러한 초고층건물공사의 현장관리 측면에서 중요성이 강조되는 관리항목들 중 하나는 시공 과정 중에 발생하는 자원의 수직이동을 관리하는 것이다. 특히 짓고자 하는 건물의 높이가 높아질수록 작업원들이 각자의 작업층으로 이동하는데 걸리는 시간은 길어지며, 자칫하면 이것이 현장의 작업능률과 생산성을 떨어뜨리는 원인이 될 수 있다. 이에 본 연구에서는 초고층건물공사 수행 시 작업원의 수직이동을 체계적으로 관리하기 위한 한 가지 방안으로서 이산형 시뮬레이션을 사용한 작업원의 수직이동계획 프로세스를 제안하였으며, 계획 프로젝트인 MT 130 타워공사를 대상으로 이것의 적정성을 검토하였다. Recently, many high-rise buildings have been constructed, and are under construction. And a high-rise building with more than 100 floors is under planning. From site logistics management point of view, it is very important to manage vertical transportation of resource (e.g., material, equipment and construction labors) in high-rise building construction. The higher the building is constructed, the more important it is to manage for vertical transportation of it. In case of labors, vertical movement needs longer time in high-rise building construction than in low-rise. This results in low productivity and work efficiency of the construction. Therefore, this study presents a process of a vertical movement plan for labors using discrete-event simulation. And then the process applies to MT 130 project, which is a virtual high-rise building construction project.

      • KCI등재

        고층건물공사 마감자재의 수직$\cdot$수평이동계획이 통합된 의사결정모델

        안병주,김재준,Ahn Byung-Ju,Kim Jae-Jun 한국건설관리학회 2001 건설관리 : 한국건설관리학회 학회지 Vol.2 No.2

        고층건물공사 현장물류계획은 수직이동계획과 수평이동계획으로 구분할 수 있다. 수평이동계획의 내용은 상대적으로 선행 프로세스인 수직이동계획 과정에서 결정되는 양중장비계획 등에 의해서 제약을 받는다. 현재 국내 건설업체들은 마감자재에 대한 이동계획과 관련해서 약산식을 사용한 가설 리프트 대수 산정, 마감자재별 물량을 양중회수로 치환하는 방법의 부재, 유사현장 사례 비교 방법의 문제점, 양중장비계획의 적정성 검토 방법의 부재, 형식적인 수평이동계획, 수직$\cdot$수평이동계획의 단절 등의 문제점을 가지고 있다. 그리고 이러한 문제점들로 인하여 수직$\cdot$수평이동계획자는 양중장비의 대수, 사용기간, 마감자재의 야적 등에 대해서 합리 적으로 의사결정을 내리지 못하고 있다. 본 연구에서는 계획자로 하여금 고층건물공사 마감자재의 수직$\cdot$수평이동계획을 통합하여 합리적으로 계획할 수 있는 의사 결정모델을 제안하고 있으며, 이 모델을 현업의 수직$\cdot$수평이동계획 과정과 비교하고 있다. 그리고 이 모델을 사용하는 계획자는 자신의 사고의 틀을 결과지향적 사고에서 과정지향적 사고로 변화시키는데 활용할 수 있고, 계획 시 직면하게 되는 한정된 자원 및 동태적 상황 등에 적절하게 대응할 수 있으며, 고층건물공사 마감자재의 수직$\cdot$수평이동계획에 대한 시스템 사고 등이 가능하다. Of all the site logistics technologies in high-rise building construction, both vertical and horizontal move plan, are the most imperative factors. And the horizontal plan follows lift-up plan as of the vertical plan. However though it may be, temporary lifts on site are numbered by heuristic formulas. The quantity of finishing material cannot be converted into lift-up load per finishing material. The lift-up plan cannot be evaluated the feasibility for finishing material move plan by a reasonable evaluation methodology. The horizontal plan is far from the vertical one. And the information as an input data for the horizontal plan is devoid of package unit size, length, and volume per finishing material. These can hardly result in reasonable and detail decision on how much to use temporary lifts, how long to use these, and where to deposit each finishing material. Therefore, this study is to suggest a decision-making model that can integrate vertical and horizontal material move plan in high-rise building construction and make a decision the plans systematically. And the study is to explain the concept, methodology, and contents of the model applied to a virtual project, named as MT 130 (Millennium Tower 130). By the model, the planner can shift his/her thinking framework on site logistics management products-oriented Into process-oriented. He/she can manage a project by the framework as system thinking, evaluate the feasibility of a lift-up plan, and decide the horizontal plan integrated with the lift-up.

      • KCI등재

        다중이용시설물 이용객의 흐름관리를 위한 3D 기반 공간 이벤트 정보 관리시스템의 개념 제안

        안병주,윤자영,김재준,Ahn, Byung-Ju,Yoon, Ja-Young,Kim, Jae-Jun 한국건설관리학회 2008 한국건설관리학회 논문집 Vol.9 No.2

        다중이용시설물에서 이용객의 안전을 책임지는 관리자들은 인간의 판단에 의존한 (human-based) 의사결정과정을 통해서 자신들의 과업과 관련된 의사결정을 내린다. 그러나 이 과정 속에는 인적과오(Human error) 발생으로 인한 인재 발생의 가능성이 상존하고 있다. 이러한 현상은 관리자의 의사결정 과정을 지원하기 위한 기술 기반 (technology-based) 의사결정 지원체계를 구축함으로써 개선할 수 있다. 3D CAD와 3D GIS 기술 등의 공간관리 기술과 이미지 프로세싱 기술 등 첨단 IT 기술들의 컨버전스를 통해 구축된 총간 관리 시스템은 관리자들에게 프로액티브한 상황 정보를 제공해 주어, 재난상황에 대해 미리 대책을 수립하여 실시간으로 대응하게 해 줌으로서 궁극적으로 인재 발생의 가능성을 줄일 수 있는 여지가 있다. 본 연구는 이러한 니즈에 기인하여 다중이용시설물에서 이용객의 흐름을 관리하기 위한 기술기반 (technology-based) 시스템의 개념을 제안하고, 시스템의 개발을 위한 요소기술의 도출 및 통합화방안을 제안했으며, 이것의 기대효과에 대해 설명하고 있다. A controller who is responsible for visiter's safety makes a decision about measures for visiter safety in human-based decision making process. Many potential accidents that are caused by human error lurk in results of the process. The accidents can be decreased by changing the decision making process from human-based into technology-based. Technology-based decision making process can catch a controller's attention through data filtering, alarm filtering, and so on. So, the controller can get information on occurrence of an unforeseen accident pro-actively. The objective of this study is to suggest a concept of 3D spatial information control system for visitor flow control in multi complex building using technology-based decision making process. This study shows utilization of the system and contribution.

      • 모바일 환경에서 의료영상 무선전송 시스템의 구현

        안병주(Byeoung ju Ahn) The Research and Information Service 2001 남부대학교 논문집 Vol.1 No.-

        병원 정보화는 이제 병원내의 진료기록, 환자영상 등을 데이터베이스로 관리하여 체계적으로 보관하며 이는 필요로 할 때 언제든지 열람할 수 있는 시스템이라 할 수 있다. 그러나 병원 내에 있지 않을 경우 이러한 최신의 시스템을 이용할 수 없고 또한 응급상황이나 의사 부재시에 신속한 영상 판독이 요구되는 경우 원격에서 각 의사마다 지급된 PDA를 사용하여 병원내의 영상 획득 장치로부터 생성된 환자 영상을 검토할 수 있도록 하였다. 이를 위하여 의사 및 환자의 계정 관리와 환자 영상을 영상획득 장치로부터 수신 받아 각 의사별로 할당하도록 하는 서버 시스템을 구현 하였으며, PDA에서 이상의 서버에 접속하여 환자의 영상을 검토할 수 있도록 구현하였다. 개인별 시스템 사용 인증을 위하여 PDA에서는 데이터베이스 RDA 방식을 사용하여 서버 데이터베이스를 엑세스하였으며, 환자 영상을 서버로부터 다운로드 하기 위하여 FTP 프로토콜을 사용하였다. 실험 결과 한 파일의 크기가 0.37Mbyte 인 832x488*24 영상 30매를 보낸다고 가정하였을 때 약 90초 정도의 시간이 걸렸으며 이는 긴급히 또는 원격에서 영상의 수신과 검토에 문제가 없음을 나타낸다. He hospital information anger hospital undergarment medical treatment record and the patient image back about under the civil official will keep recently systematically in data base and when doing in necessity, the system it will be able to read at any time is a possibility of doing The case which will not be but inside the hospital it will not be able to use the system of like this newest PDA where it is provided from the case unit standing where the image interpretation which is quick at doctor vice- re- hour is demanded and also emergency situation or each doctor in order about under using hospital undergarment image [hoyk] it will be able to investigate the patient image which creates from pole system, To reach and to respect from image acquisition system in order to allocate the accounts civil official and patient image of the doctor and the patient with the reception receiving each doctor star, it embodied the server system, from PDA it will be able to investigate the image of the house belonging patient in server above in order, it embodied. For the personal star system use notarization data base RDA method about under using server database from PDA [eyk] three [su], in order to do patient image from server the knock-down road FTP protocol it used. The size of experimental resultant one file sends 0.37Mbyte th person 832*488/24 image 30 every and, when assuming, the time of about 90 second degree is caught and urgently or from unit standing the problem will not be shows in the reception and investigation of image.

      • KCI등재
      • KCI등재

        가슴우리 X-ray 촬영에서 복장뼈의 선예한 영상을 얻기 위한 촬영법 연구

        안병주(Byung-Ju Ahn),이준행(Jun-Haeng Lee) 한국방사선학회 2021 한국방사선학회 논문지 Vol.15 No.3

        본 연구는 Thoracic cage Rando Phantom을 이용하여 가슴우리 구성하는 뼈중에서 복장의 선예한 영상을 얻고자 영상의 검사방법을 연구하였다. 엑스선관 초점에서 팬톰거리는 80Cm에서 엑스선관 각도에는 수직으로 팬톰의 자세는 우측 및 좌측의 후전사방향과 우측 및 좌측 전후 사방향 자세로 20°, 25°, 30° 변경하여 검사하였다. 획득한 영상을 방사선사가 주관적으로 영상평가 하였으며, 평가 데이터를 SPSS ver. 3.0으로 분석하였다. ImageJ Program을 이용하여 신호대잡음비(SNR)를 계산하였다. 그 결과 Cronbach Alpha 값이 0.789로 유의하게 높았다. 신호대잡음비(SNR)의 결과는 갈비과 정확한 복장뼈의 영상을 얻고자 할 때는 엎드린 자세에서는 검사 시 우측 후전사방향 20°에서 6.038으로 높았으며 바로누운자세에서는 좌측 전후사방향 25° 검사 시 에서 7.860으로 높았다. 결론으로 복장뼈의 선예한 영상을 얻고자 엑스선 촬영기법으로 엎드려서 촬영할 경우에는 환자자세를 우측후전사방향 20°에서 또한 바로누운자세에서 촬영 할 경우에는 좌측전후사방향 25°에서 촬영기법을 이용한다면 선예한 영상을 얻을 수 있으리라 사료된다. The Study studied the Inspection Method of Images to obtain a sharp image of the Costume among the bones Composed of Thoracic Using the Thoracic Cage Rando Phantom. At 80 cm of the phantom Distance at the X-ray tube focus, the position of the Phantom was Examined by Changing the Rt and Lt Posterior Oblique(LAO) and Rt and Lt Posterior Postero Oblique positions by 20°, 25° and 30°. The acquired images were Subjectively Evaluated by the Radiographer, and the Evaluation data were analyzed as SPSS ver. 3.0. The signal-to-noise ratio (SNR) was Calculated using the ImageJ Program. As a result, the Cronbach Alpha value was Significantly higher at 0.789. The results of the Signal-to-Noise Ratio (SNR) were high at 20° to 6.038 in the right posterior Transcription Direction at the time of Examination and 7.860, in the Supine Position, for images of Sternum bones. In conclusion, it is Believed that the patient position can be obtained from the Right Anterior Oblique(RAO) Position 20° if the X-ray technique is used to obtain the Sternum s advanced image, and the Left Anterior Oblique(LAO) Position 25° when filming in the Rght lying position.

      • KCI등재

        3D 프린팅으로 제작한 굵은 골재를 사용한 경량콘크리트의 압축강도 실험

        안병주(Byung-Ju Ahn) 한국산학기술학회 2020 한국산학기술학회논문지 Vol.21 No.5

        콘크리트의 품질에 큰 영향을 미치는 중요 자재인 굵은 골재는 채취장소, 생산방법 등에 따라 다양하게 생산된다. 현재 건설업계는 굵은 골재의 안정적인 공급과 표준적인 품질 확보 방안이 필요한 실정이다. 본 연구는 굵은 골재를 3D 프린팅으로 제작하여 사용하는 것이 이 문제 해결에 도움이 되는지를 검토하는 것이 목적이다. 3D 프린팅을 위한 필라멘트는 검토 결과 ABS 필라멘트가 선정되었다. 굵은 골재의 설계는 CATIA를 사용했으며, 제작은 CUBICON Single Plus를 사용하였다. 공시체는 3개의 AE제를 사용 것과 3개의 그렇지 않은 것 등 총 6개를 제작한 후 28일 동안 수중 양생하였다. 압축강도 시험 결과 AE제를 사용할 경우 콘크리트표준시방서에서 규정한 경량콘크리트 설계기준의 최저 압축강도 이상이 발현됨을 확인했다. 이는 3D 프린터로 제작한 굵은 골재가 경량콘크리트의 굵은 골재로 사용될 가능성이 있음을 시사한다. 특히 대량생산 체계를 갖출 경우 궁극적으로 굵은 골재의 안정적 수급과 표준적인 품질 확보라는 건설업계가 당면하고 있는 문제 해결에도 일조할 수 있을 것이다. 향후에는 3D 프린팅으로 제작한 굵은 골재의 부착력 향상 방안, 경제성 분석 등에 관한 연구를 진행할 예정이다. Coarse aggregate is produced in various ways depending on the location and production method. Currently, the construction industry is in need of a stable supply of coarse aggregate and a way to secure standard quality. The purpose of this study is to examine whether the use of coarse aggregate in 3D printing can help solve this problem. ABS filament was selected for use in 3D printing. CATIA was used for the design of the coarse aggregate, and CUBICON Single Plus was used for the production. Six specimens were produced and cured in water for 28 days. Three of them were made with AE agent, and three were made without it. A compressive strength test confirmed that when the AE agent was used, the compressive strength was greater than the lightweight concrete design criterion specified in the concrete standard specification. This suggests that coarse aggregate produced by a 3D printer may be used for lightweight concrete. A mass production system using this method could help to solve the problems facing the construction industry, such as stable supply and demand for coarse aggregate and securing standard quality.

      • 소진과 이직의도가 조직시민행동에 미치는 영향

        안병주(Ahn, Byung-Joo),차민석(Cha, Min-Seok) 대한경영학회 2013 대한경영학회 학술발표대회 발표논문집 Vol.2013 No.2

        본 논문에서는 대단위 수행조직의 원형이라고 할 수 있는 군 조직을 대상으로 ‘소진(burnout)’, ‘이직의도(intention to leave)’, ‘조직시민행동(organizational citizenship behavior, 이하 OCB)’간의 관계를 규명하고 ‘일-가정갈등(work-family conflict, 이하 WFC)’의 조절효과를 검증하였다. 대한민국 해군을 대상으로 설문지 1,500부를 배포한 후 1,372부를 회수하여 분석한 결과는 다음과 같다: 첫째, 소진은 이직의도에 정(+)의 영향을 주었다. 둘째, 이직의도는 조직시민행동에 부(-)의 영향을 주는 것으로 나타났다. 셋째, 소진은 조직시민행동에 부(-)의 영향을 주었다. 마지막으로, WFC는 소진과 이직의도 및 이직의도와 조직시민행동의 관계를 조절하여 소진이 이직의도에 미치는 정(+)의 영향력을 강화하고 이직의도가 OCB에 미치는 부(-)의 영향력을 강화시키는 것으로 나타났다. 즉, WFC를 높게 인지할수록 소진이 이직의도에 미치는 정(+)의 영향이 강했고, 이직의도가 OCB에 미치는 부(-)의 영향이 강하게 나타난 것이다. OCB와 소진‧이직의도의 관계에 대한 연구는 OCB의 부정적인 결과요인에 초점을 맞춰 OCB가 소진과 이직의도를 유발한다는 연구들이 대부분이다. 본 연구에서는 선행연구들과는 반대로 소진과 이직의도가 OCB에 어떤 영향을 미치는지 알아보고자 하였다. 이것은 소진과 이직의도가 OCB에 미치는 영향에 대한 연구를 찾기 어려운 상황에서 이루어 졌다는 점과 생명을 걸고 임무를 수행해야하는 특수성 때문에 OCB의 중요성이 더욱 부각되는 군 조직을 대상으로 적용해 보았다는 점에서 의미가 있다. 일반기업들을 대상으로 많은 연구가 진행된 WFC에 관한 연구를 군 조직에 적용해 보았으며, WFC의 독립변수나 종속변수로서의 역할이 아닌 조절변수로서의 영향력을 알아보았다. 이것은 WFC의 조절효과에 대한 연구를 찾기 어려운 상황에서 이루어졌다는 점에서 의미가 있다. 해군 조직이라는 한계점을 감안하고, 학문적․실무적 시사점을 심화 및 확대할 수 있는 향후 연구방향을 제시하고 있다. There has been continuous research on burnout, ITL(Intention to Leave) and OCB(Organizational Citizenship Behavior) using firms, public companies, hotels etc in ROK(Republic of Korea). But, the research on military has been rare, especially the area focusing on moderating effect of WFC(Work-Family Conflict) in ROK. Therefore, I suggest an integrated model using variables such as burnout, ITL, OCB and moderating variable such as WFC. Focus on moderating effect of WFC and main effect of burnout‧ITL have been verified in this paper. Hierarchical multiple Regression analysis has been conducted using ROK Navy survey data(1,372), producing following results: Firstly, the positive effect of burnout on ITL is verified. Secondly, the negative effect of ITL on OCB is verified. Thirdly, the negative effect of burnout on OCB is verified. Fourthly, moderating effect of WFC is verified(relationship between burnout and ITL / relationship between ITL and OCB). This research finds out the effect of burnout and ITL on OCB. At once, WFC that has been previously actively studied and researched on ordinary firms are applied and extended to military one of government organization. This is meaningful, because experiential research of WFC on military has very rare in ROK.

      • KCI등재

        커튼월공사의 적시생산(JIT)관리를 위한 양중조달 시스템 개발에 관한 연구

        안병주(Ahn Byung-Ju),양종엽(Yang Jong-Youb),백종건(Baik Jong-keon),김재준(Kim Jae-Jun) 대한건축학회 2003 大韓建築學會論文集 : 構造系 Vol.19 No.8

        There are many problems in site logistics management of high-rise building construction performed in downtown area due to limited staging spaces for materials and temporary facilities. Hence, studies on JIT concept focused on construction materials keep increasing as a solution for the problems. Curtain-wall work is a prerequisite for interior work and one of the most important materials because of its quantity to be dealt with. This study analyzes problems of curtain-wall logistics in construction sites, and suggests a direction and a model of system for transportation and procurement management of curtain-wall. And then, the model is evaluated by case study. As a result, it is expected that the system will contribute to JIT management of site logistics, and help managers make decisions and actions promptly on various problems. This study will also contribute to direction and development of transportation and procurement systems for other finishing materials.

      연관 검색어 추천

      이 검색어로 많이 본 자료

      활용도 높은 자료

      해외이동버튼