http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
Material Management Using Radio-Frequency Identification (RFID) in the Construction Industry
김창완,허영기,권순욱,Kim Changwan,Huh Youngki,Kwon Soonwook Korea Institute of Construction Engineering and Ma 2004 건설관리 : 한국건설관리학회 학회지 Vol.5 No.1
The advent of Radio Frequency Identification (RFID) technology has created new opportunities for improving the material management function in the construction industry and is starting to provide major improvements in the efficiency of the material management process. The objective of the research reported herein was to introduce the benefits of RFID technology on material management in the construction industry. RFID technology is discussed and various aspects of this technology are investigated. Potential RFID applications on material management proposed by Construction Industry Institute (CII) Breakthrough Strategy Committee (BTSC) and Fully Integrated and Automated Technology (FIATECH) are spelled out Finally, business analysis of RFID to estimate its impact is provided. It is concluded that there is a significant potential for improvement of material management function in the construction industry through the use of RFID.
건설 기술 연구 개발을 위한 기술 기획 : 적시 시공을 위한 시공 현장 모니터링 기술 사례를 기반으로
김창윤(Kim Changyoon),김형관(Kim Hyoungkwan),김창완(Kim Changwan),김문겸(Kim Moon Kyum) 대한토목학회 2008 대한토목학회논문집 D Vol.28 No.6D
기술 로드맵은 신제품 개발과 연구 과제 도출을 위한 기획방법론 중 하나로 여러 연구 기관과 산업계에서 사용되고 있다. 제품 개발자나 연구 진행자들은 기술 로드맵을 사용함으로써 체계적인 프로젝트 진행과 효과적인 연구를 수행할 수 있으며, 연구 내용, 추진 전략, 소요 예산 등을 정확하게 설정할 수 있어 연구개발 가능성을 높일 수 있다. 현재 국토해양부에서는 건설 분야 기술력 증진 및 건설 산업 발전을 위하여 많은 연구개발 예산을 투입하고 있으며, 그 규모 또한 점차 늘어날 것으로 예상된다. 연구개발 예산이 증가함에 따라 5년 이상의 장기 연구개발 과제가 늘어나고 있고, 그 결과 체계적인 연구 수행과 높은 기술 개발 가능성을 위한 방법론의 필요성이 점차 커지고 있다. 건설 산업의 연구 개발은 타 산업의 연구 개발과는 달리 연구 개발 후 현장 적용을 기본 목표로 하고 있으며 작업을 하는 공간 또한 외부에 노출되어 있어 개발된 기술의 적용이 용이하지 않은 특성을 가지고 있다. 본 논문에서는 위와 같은 건설 산업의 특성을 고려하여 다양한 문헌 분석, 설문 조사를 통한 시장 수요 조사, 사전 연구를 통한 기술의 적용 가능성 검토를 실시하였으며 이를 통하여 새로운 건설 기술 연구 개발을 위한 기술 로드맵 도출 과정을 제시하고, 사례 연구를 통하여 기술 로드맵 도출 과정에 대한 타당성 및 적용 가능성을 알아보고자 한다. Technology roadmapping is one of the widely used technology planning methodologies. Using a technology roadmap, the researchers can increase the possibility of the project success by systematic management of research contents, budgets, and commercialization strategies. Currently, Ministry of Land, Transport and Maritime Affairs has a plan to increase the research fund to improve the construction industry. As a result, the number of long term research projects with more than five years of research period, is increasing. Tills entails the need for a methodology for the systematic planning and management of research. However, the construction industry has the characteristics that the research results should ultimately be implemented in an outdoor environment. Through processes of diverse literature reviews, questionnaire-based survey, and pilot research, this paper presents a systematic procedure for the development of construction technology roadmaps, which can consider the unique nature of the construction industry. Based on the procedure, a technology roadmap for intelligent construction monitoring is also developed.
김태형(Taehyung Kim),김창완(Changwan Kim),김진(Jin Kim),채상훈(Sanghun Choi),금재성(u-FRA I&C) 대한설비공학회 2010 대한설비공학회 학술발표대회논문집 Vol.2010 No.6
Like many other countries around the world, Korea is rushing to find ways to reduce its dependency on fossil fuels. A possible solution to this problem is renewable energy. The renewable energy has many advantages such as environment friendly, zero carbon and non-exhaustion. But the downside of renewable energy resources is the lack of commercialization capability due to climatic conditions. In order to solve this problem, the hybrid plant with various renewable energy resources is studied.
Data Collection Methodology of Activity Production Rates for Contract Time Determination
허영기,김창완,송종철,Huh Youngki,Kim Changwan,Song Jongchul Korea Institute of Construction Engineering and Ma 2004 건설관리 : 한국건설관리학회 학회지 Vol.5 No.1
Contract time determination for highway construction projects has never been easy despite considerable research efforts from academia as well as industry. High variations in crew production rates are considered one of the main barriers to accurate contract time determination. This paper presents a methodology for collecting field information on crew production rates which will help to enhance the accuracy of contract time determination for highway bridge construction. Based on a standard data collection tool developed, data on field crew production rates was collected from 14 on going projects in Texas, USA, over the past two years. The production rates based on the data collected were considered by industry practitioners to be more realistic and practical than those available to the current practices. As more data becomes available, key drivers influencing production rates could be identified and provide site personnel with a means to better plan and control production in a project specific context.
시뮬레이션을 활용한 건설현장에서의 중장비 운영 최적화 방안에 관한 연구
손효주(Son Hyo Joo),김창완(Kim Changwan),조승연(Cho Seung Yun),김용수(Kim Yong-Su) 대한토목학회 2007 대한토목학회논문집 D Vol.27 No.5D
지난 수십 년간 기술 개발을 통한 건설 산업 중장비의 자동화와 시설물의 대형화에 따른 건설 산업의 기계화에 대한 요구에 따라 건설 현장에서의 중장비 운용은 크게 증가하였다. 이러한 현장에서의 장비사용 증대로 인해 건설현장의 장비 운영의 효율성을 높이기 위한 방법을 개발하고가 하는 요구가 높아졌다. 시뮬레이션은 프로세스의 생산성을 높이고, 비용을 절감시키는데 효율적인 도구임에도 불구하고, 건설 산업에서의 활용은 매우 제한적이었다. 본 연구는 시뮬레이션 도구인 STROBOSCOPE를 5개 토목 공정에 적용하여 건설 현장의 공정을 모델로 구현하여 건설현장 적용성 및 대안 선정 도구로서의 유용성을 검증하고자 하였다. 이를 위하여 본 연구에서는 시뮬레이션을 이용한 현장의 공정에 대한 모델 구축에 관한 방법 및 그에 따른 결과 분석을 제시하였다. 마지막으로 생산성과 비용을 고려한 최선의 대안을 선정하기 위하여 민감도 분석 결과를 설명하였다. In last decades, the use of heavy equipment on a construction site has been rapidly increased with the automation of heavy equipment in the construction industry and to meet the demand of mechanization of construction. With the increasing use of heavy equipment on construction sites, the efficiency of heavy equipment operations is concerned. Simulation tool has been acknowledged as an effective tool to improve productivity and reduce cost but there has been limited use in the construction industry. In this article, STROBOSCOPE, a simulation tool, has been applied in five construction sites to verify its applicability to model construction process and usefulness as an alternative selection tool. The various procedures used in the simulation are explained. The results of the simulations based on actual construction sites are described. The results of sensitivity analysis to select best alterative which consider productivity and cost are also discussed.