허진,Huh, Ginn 한국기술사회 1988 技術士 Vol.21 No.4
On the foundation work of Po-Ryong power plant #3 & #4. It was 30meters away from the running states of #1 & #2 plant site. In order to protect the #1 & #2 power plant facilities & factory structure. Allowable vibration was required below 0.07 gal. Therefore, it had to set up the anti-vibration trench to reduce the vibration reference and secondary. I applied the low gravity and low velocity explosives with M/S delay caps by cautious blasting pattern.
허진,Huh, Ginn 한국기술사회 1990 技術士 Vol.23 No.6
First of all, Under given condition such as bit gage of 36mm Drill bit with right class of jack-logs experimental test carried out from two face of Bench, firing of each hole brought 90 degree Angle face and them measured length of Burden and charged ammount of powder as following. (equation omitted) A=Activated Area A=ndi=m S=Peripheral length of Charged. room Ca=Rock Coeffiecency d : di=Hole diameter When constructed subway of Seoul in 1980 the blasting works increased complaint of ground vibration. in order to prevent the damage to structures. Some empirical equations were made as follows on condition with Jackleg Drill (Bit Gage ø 36mm) and within 30 meter distance between blasting site and structures. V=K(D / W)$\^$-n/ N=1.60-1.78 K=48-138 Project one of contineous works to above a determination of empirical equation on the cautious blasting vibration with Crawler Drill(ø 70-75mm) in long distance. V=41(equation omitted) V=124(equation omitted).
허진,Huh Ginn 대한화약발파공학회 1990 화약발파 Vol.8 No.3
First ot of all, under given condition such as bit gage of 36mm Drill bit with right class of jack-leg-experimental test carried out from two face of Bench, firing of each hole brought 90 degree Angle face and them measured length of Burden and charged ammount of powder as following. $ca=\frac{A}{SW}$ A=Activated Area A=nd i=m S=Peripheral length of charged, room Ca=Rock Coeffiecency d: di=Hole diameter When constructed subway of Seoul in 1980 the blasting works increased complaint of ground vibration, in order to prevent the damage to structures. Some empirical equations were made as follows on condition with Jackleg Drill (Bit Gage 36mm) and within 30 meter distance between blasting site and structures. $V=K(D/W)^{-n}$ N=1.60 - 1.78 K= 48 - 138 Project is one of contineous works to above a determination of empirical equation on the cautious blasting vibration with Crawler Drill (70-75mm) in long distance. $V=41(D/\sqrt[3]{W})^{-1.41}$ $30m\le{D}\le{100m}$ $V=124(D/\sqrt[3]{W})^{-1.66}$ $100m\le{D}\le{285m}$.
부산 통신구굴진 발파작업으로 인한 지상주택 구조물에 미치는 진동폭음영향계측조사보고
허진,Huh Ginn 대한화약발파공학회 1990 화약발파 Vol.8 No.2
The Caustious blasting have often increased Complaints of ground Vibration and Sound when the Wire-Tunnel Constructed in Pusan. In order to prevent the influence to housing structure, it was necessary to predict blasting-Induced Vibration and Sound. The Suveyer determined the Burden and spacing of Drill holes, minimum delay charges within a allowable Vibration and Sound Level. Tunnel drilling and Ignition patterns are made as follows; No. 1 Tunel (Stable rock, hard rock) No.2 Tunnel (Instable plastic rock; wethered rock) and other Tunnels (Instable rock). The result of 1st testing blasting of No. 1 Tunnel was recorded Under allowable Vibration Level but sound was over 75 Db of allowable value. So Tunnel drilling pattern was amended with 52 Non-charg holes to reduce the blast-sound. The other pattern had no need to amend.
S화력발전소 3, 4호기 증설에 따르는 정밀발파작업으로 인한 인접가동발전기및 구조물에 미치는 파동영향조사
허진,Huh Ginn 대한화약발파공학회 1990 화약발파 Vol.8 No.1
The cautious blasting works had been used with emulsion explosion electric M/S delay caps. Drill depth was from 3m to 6m with Crawler Drill $\varphi{70mm}$ on the calcalious sand stone(sort-moderate-semi hard Rock). The total numbers of feet blast were 88. Scale distance were induces 15.52-60.32. It was applied to propagation Law in blasting vibration as follows. Propagtion Law in Blasting Vibration $V=K(\frac{D}{W^b})^n$ where V : Peak partical velocity(cm/sec) D : Distance between explosion and recording sites (m) W : Maximum Charge per delay-period of eighit milliseconds or more(Kg) K : Ground transmission constant, empirically determind on th Rocks, Explosive and drilling pattern ets. b : Charge exponents n : Reduced exponents Where the quantity $D/W^b$ is known as the Scale distance. Above equation is worked by the U.S Bureau of Mines to determine peak particle velocity. The propagation Law can be catagrorized in three graups. Cabic root Scaling charge per delay Square root Scaling of charge per delay Site-specific Scaling of charge per delay Charge and reduction exponents carried out by multiple regressional analysis. It's divided into under loom and over loom distance because the frequency is verified by the distance from blast site. Empirical equation of cautious blasting vibration is as follows. Over 30m----under l00m----- $V=41(D/3\sqrt{W})^{-1.41}$ -----A Over l00m-----$V= 121(D/3\sqrt{W})^{-1.66}$-----B K value on the above equation has to be more specified for furthur understang about the effect of explosives, Rock strength. And Drilling pattern on the vibration levels, it is necessary to carry out more tests.