이걸찬(Lee Gul-Chan),김경래(Kim Kyung-Rai),신동우(Shin Dong-Woo) 대한건축학회 2004 大韓建築學會論文集 : 構造系 Vol.20 No.9
The Critical Path Method(CPM) is an effective tool used for planning and scheduling, One of the strong point in the CPM is what it can calculate float Float can be used without having an effect on overall schedule of project However, concept and scope about ownership is not defined yet because it is a by-product of the project Thus participants have had many disputes in using float because of their interests In recent years, a few the ones have evolved m an attempt to solve this problem But the previous research did not make a reasonable distribution of float because their criteria of distribution was based on ratio for total project time Actually, an application of float is achieved by participant's delay risk Therefore, this paper proposes a framework for the assessment of the delay risks and criteria for float distribution using delay risks Furthermore, this paper proposes distribution method by linear programming that is able to distribute reasonably and systematically using the value of risk assessment.<br/>