http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
육심균,김성호,이병은,이상룡,Yook, Sim-Kyun,Kim, Sung-Ho,Lee, Byeong-Eun,Lee, Sang-Ryong 대한기계학회 2003 大韓機械學會論文集B Vol.27 No.12
An optimal soot blowing system has been developed for an optimal operation of power utility boilers by both minimization of the use of steam and the number of soot blowers worked during soot blowing. Traditionally, the soot blowing system has been operated manually by operators. However, it causes the reduction of power and thermal performance degradation because all soot blowers installed in the plant should be worked simultaneously even there are lots of tubes those are not contaminated by slagging or fouling. Heat transfer area is divided into four groups, furnace, convection area including superheater, reheater and economizer, and air preheater in the present study. The condition of cleanness of the tubes is calculated by several parameters obtained by sensors. Then, a part of soot blowers works automatically where boiler tubes are contaminated. This system has been applied in a practical power plant. Therefore, comparison has been done between this system and manual operation and the results are discussed.
육심균,류제욱,이익형,이상룡,Yok, Sim-Kyun,Ryu, Jae-Wook,Ik-Hyeong,Lee, Sang-Ryong 대한기계학회 2003 大韓機械學會論文集B Vol.27 No.11
The experimental investigation of a coal splitter used in the 500㎿(e) boilers of fossil power plant is carried out to validate the design criteria. To predict air flow and the amount of particles at the exit, velocity and the weight of particles are measured on test planes using the coal splitter model with two-dimensional phase doppler particle analyzer and the glass fiber filter. It is found that the position of guide plate influences significantly both flow rates of gas and particle at the exit. Gas flow rate was a linear function of the guide plate, whereas particle flow rate was a exponential function of it.
보일러 최적운전을 위한 Soot Blower 운전에 관한 연구
육심균(Simkyun Yook),김성호(Sungho Kim),정해원(Haewon Jung),조창호(Changho Cho) 대한기계학회 2003 대한기계학회 춘추학술대회 Vol.2003 No.11
In a coal-fired boiler, deposited slag and foul from combustion of coal pose a serious problem in heat transfer between water walls and tube bundles, after all, it reduce boiler efficiency and cause unstable load change. Old fashioned operation of soot blower to remove the accumulated ash without considering efficiency of boiler cause excessive consumption of steam and additional auxiliary power energy for sootblowing. In this study, we developed optimal soot blowing system and applied it to utility and then compared the result of optimized operation with that of old fashioned operation of soot blower.
조창호,육심균 한국원자력산업회의 2003 원자력산업 Vol.23 No.7
제어봉 구동 장치 제어 시스템 국산화 개발의 필요성은 경제적 관점에서 뿐만 아니라 원전의 운전과 유지 보수 측면에서도 어제 오늘 대두된 문제가 아니라 본다. 천연 자원이 부족한 우리나라에서는 급증하는 전력 수요를 충족시키기 위하여는 원전에 의존하지 않을 수 없으며, 이에 따라 가동 원전의 수명 연장을 위한 개$\cdot$보수뿐만 아니라 신규 원전 건설 계획 또한 지속적으로 수립되고 있는 것이 현실이다. 그러나 국내에 처음으로 고리 1호기가 건설된 1978년 이후 그 동안 많은 사람들의 노력에 의하여 설비 제작 관련 기술은 거의 완성 단계에 와 있다고 보여지나, 두뇌와 신경 조직에 해당하는 계측 제어 시스템 관련 기술은 아직 초보 단계를 벗어나지 못하고 있는 것이 사실이다. 이러한 우리의 현실을 극복하기 위하여 과학기술부 주관으로 원전계측제어시스템국산화사업단이 발족하였으며, 국내 원자력 산업계를 실질적으로 이끌고 있는 당사가 최종 상용화를 목표로 막대한 자금을 부담하면서 주도적으로 참여하고 있다. 지난 5월 제어봉 구동 장치 제어 시스템이 그 첫 결과물로서 발표 되었으며, 여기서는 기존 시스템과의 비교 분석을 통하여 그 개발 시스템의 기술적 경제적 특징과 의의를 살펴 보고자 한다.