http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
몽골 울란바토르시 Naranjin Enger 매립지 매립가스 발전사업 타당성 평가
권희동(Hee-Dong Kwon),이형돈(Hyung-Don Lee),천승규(Seung-Kyu Chun) 한국신재생에너지학회 2018 신재생에너지 Vol.14 No.4
We investigated the possible effects of a waste power generation plant and gas recovery from a landfill at Naranjin Enger Disposal Site (NEDS) in Ulaanbaatar, Mongolia. The household waste generation rate, waste composition, and treatment ratio in Ulaanbaatar, Mongolia from 2005 to 2015 were investigated using field survey data and a documentary survey. Field survey research investigating landfill structure, amount of disposed waste, and characteristics of landfill gas (LFG) concentration including CH₄, CO₂, O₂, H₂S, and N₂ was then conducted, and the amount of LFG generated from 2022 to 2041 was predicted using a first order decay model. The results indicated that a landfill power generation plant at NEDS in Ulaanbaatar could be operated by minimum 2.7 MW, and 24.1% of the Green House Gas (GHG) reduction in the waste department of Mongolia was expected to be achieved in 2030.