    Unravelling the Drivers for Cost overruns in Tanzania’s Railway Infrastructure Projects

    한글로보기

    https://www.riss.kr/link?id=T17415875

    • 0

      상세조회
    • 0

      다운로드
    서지정보 열기
    • 내보내기
    • 내책장담기
    • 공유하기
    • 오류접수
    인용문이 복사되었습니다.

    부가정보

    다국어 초록 (Multilingual Abstract) kakao i 다국어 번역

    This study investigates the key factors contributing to cost overruns in railway projects in Tanzania, a country undergoing rapid infrastructure development with substantial investment in the railway sector.

    This study investigates the key factors contributing to cost overruns in railway projects in Tanzania, a country undergoing rapid infrastructure development with substantial investment in the railway sector.

    더보기

    목차 (Table of Contents)

    • TABLE OF CONTENTS
    • CHAPTER 1 1
    • 1.1 Background 1
    • 1.2 Common Causes of Cost Overruns in Railway Construction Projects 2
    • TABLE OF CONTENTS
    • CHAPTER 1 1
    • 1.1 Background 1
    • 1.2 Common Causes of Cost Overruns in Railway Construction Projects 2
    • 1.3 Problem Statement 4
    • 1.4 Research Objectives 5
    • 1.5 Scope of the study 7
    • 1.6 Significance of the Research 7
    • 1.7 Organization of the Thesis 8
    • CHAPTER 2 10
    • 2.1 Introduction 10
    • 2.2 Current State of Railway Development in Tanzania. 11
    • 2.3 Cost Overrun 12
    • 2.3.1 Definition of Cost Overrun 12
    • 2.3.2 Extent of Cost Overruns in Infrastructure Projects 13
    • 2.3.3 Causes of Cost Overrun 14
    • 2.3.4 Factors Selection 21
    • 2.4 Summary of Literature Review 25
    • 2.5 Research gap 26
    • CHAPTER 3 27
    • 3.1 Research design 28
    • 3.2 Research Approach 28
    • 3.3 The study area 28
    • 3.4 Target Population 28
    • 3.5 Sampling Techniques and Sample Size 29
    • 3.6 Data Collection Methods 29
    • 3.6.1 A desk study: 29
    • 3.6.2 Questionnaire 30
    • 3.7 Justification of Methodology 34
    • 3.8 Data Analysis. 35
    • 3.9 Ethical Considerations. 35
    • 3.10 Reliability and Validity. 36
    • CHAPTER 4 37
    • 4.1 Analysis of selected projects 37
    • 4.2 Analysis of questionnaire Survey data 38
    • 4.2.1 Data Preparation 38
    • 4.2.2 Level of Measurement 38
    • 4.2.3 Descriptive Analysis 39
    • 4.2.4 Internal Consistency Test 39
    • 4.2.5 Testing hypotheses 40
    • 4.2.6 Ranking of Cost Overrun Causes 41
    • CHATER 5 43
    • 5.1 Introduction 43
    • 5.2 Desk study of selected projects and Policies 44
    • 5.2.1 Desk study of Policies. 44
    • 5.2.2 Desk study of selected projects 45
    • 5.3 Questionnaire survey 47
    • 5.3.1 Respondents’ demographic information 47
    • 5.3.2 Internal consistency test 52
    • 5.3.3 Factors ranking 52
    • 5.3.4 Hypotheses Testing 61
    • 5.4 Comparative Analysis with Results of Other Studies 73
    • 5.4.1 Comparison with Other Sectors in Tanzania 74
    • 5.4.2 Comparison with Other Countries 74
    • CHAPTER 6 78
    • 6.1 CONCLUSION 78
    • 6.2 Recommendations 80
    • 6.3 Limitations of the Study 82
    • 6.4 Recommendations for Future Research 83
    더보기

    분석정보

    View

    상세정보조회

    0

    Usage

    원문다운로드

    0

    대출신청

    0

    복사신청

    0

    EDDS신청

    0

    동일 주제 내 활용도 TOP

    더보기

    주제

    연도별 연구동향

    연도별 활용동향

    연관논문

    연구자 네트워크맵

    공동연구자 (7)

    유사연구자 (20) 활용도상위20명

    이 자료와 함께 이용한 RISS 자료

    나만을 위한 추천자료

    해외이동버튼