This study investigates the key factors contributing to cost overruns in railway projects in Tanzania, a country undergoing rapid infrastructure development with substantial investment in the railway sector.

http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.
변환된 중국어를 복사하여 사용하시면 됩니다.
https://www.riss.kr/link?id=T17415875
대전 : 우송대학교 일반대학원, 2026
학위논문(석사) -- 우송대학교 일반대학원 , 철도시스템학전공(철도건설공학코스) , 2026. 2
2026
한국어
대전
xii, 99p ; 26 cm
지도교수: 안태봉
I804:25019-200000972923
0
상세조회0
다운로드다국어 초록 (Multilingual Abstract)
This study investigates the key factors contributing to cost overruns in railway projects in Tanzania, a country undergoing rapid infrastructure development with substantial investment in the railway sector.
This study investigates the key factors contributing to cost overruns in railway projects in Tanzania, a country undergoing rapid infrastructure development with substantial investment in the railway sector.
목차 (Table of Contents)