    Railway Construction Management : A New Framework for Reducing Costs and Preventing Budget Overruns Using Current Management Flaws

    한글로보기

    https://www.riss.kr/link?id=T17415850

    • 0

      상세조회
    • 0

      다운로드
    서지정보 열기
    • 내보내기
    • 내책장담기
    • 공유하기
    • 오류접수
    인용문이 복사되었습니다.

    부가정보

    다국어 초록 (Multilingual Abstract) kakao i 다국어 번역

    Railway infrastructure projects worldwide frequently experience significant cost overruns, raising serious concerns regarding their financial sustainability and long-term viability.

    Railway infrastructure projects worldwide frequently experience significant cost overruns, raising serious concerns regarding their financial sustainability and long-term viability.

    더보기

    목차 (Table of Contents)

    • CONTENTS
    • LIST OF FIGURES 13
    • ABSTRACT 15
    • CHAPTER 1 1
    • CONTENTS
    • LIST OF FIGURES 13
    • ABSTRACT 15
    • CHAPTER 1 1
    • 1.1 Problem Statement, Scope, and Significance of the Study 1
    • 1.1.1 Significance of the Study 3
    • 1.2 Literature Review 6
    • 1.3 Structure of the Study and Research Methodology 10
    • Chapter 2 16
    • 1.1 Legal Fundamentals 16
    • 1.1.1 The main Differences between Common law vs. civil law systems 16
    • 1.1.2 The most important differences between common law and civil law in the application of the Code of Procedure and substantive law in counterclaims 16
    • 1.2 The relation between Misunderstanding the law and construction of railway projects 16
    • 1.3 Contract Overview 16
    • 1.3.1 Key Elements of a Valid Contract (Offer, Acceptance, Consideration, etc. 16
    • 1.3.2 Avoid legal mistakes consequenses in meetings 16
    • 1.4 Summary of the case due to legal misunderstanding of the consequences 16
    • 1.1 Legal Fundamentals 17
    • 1.1.1 18
    • 1.1.2 The main Differences between Common law vs. civil law systems 19
    • 1.1.3 The most important differences between common law and civil law in the application of the Code of Procedure and substantive law in counterclaims 20
    • 1.2 The relation between Misunderstanding the law and construction of railway projects 21
    • 1.3 Contract Overview 24
    • 1.3.1 Key Elements of a Valid Contract:- 24
    • 1.3.2 Avoid legal mistakes consequenses in meetings 25
    • 1.4 Summary Case Due to Misunderstanding the Consequences 27
    • Chapter 3 29
    • Chapter 3 15
    • 3.1 Organizational Structures 15
    • 3.1.1 Main Common Types in Organizational Charts:- 17
    • 3.1.2.1 Hierarchical Functional Organization Chart:- 17
    • 3.1.2.1.1 the influences of disadvantages in railway project causes money losses 20
    • 3.1.2.1.2 Strategies to Overcome Disadvantages in a Hierarchical Functional Organization:- 21
    • 3.1.2.2 Projectized Organization Chart 23
    • 3.1.1.3 Matrix Organization Chart 27
    • 3.2 Project Management Methodologies:- 30
    • 3.2.1 Definitions agile methodology , waterfall , hyperid methodology :- 31
    • 3.2.2 Uses of Both Methodologies and how to save 31
    • 3.2.2.1 A Non-Blame Culture 33
    • 3.2.2.1.1. Example :how non blam culture may save The Hinton train disaster, which took place on February 8, 1986 35
    • 3.3 Stakeholder managment 36
    • 3.3.1 Stakeholder Definition 36
    • 3.3.1.1 what is the motivations of some stakeholder they want to stop the work? 37
    • 3.3.1.1.1 Internal Stakeholders (Project Participants) 38
    • 3.3.1.1.2 External Stakeholders (Affected Entities) 40
    • 3.3.1.2 Affecting stakeholders' relative power and influence 40
    • 3.3.1.2.1 Expample :-berlin railway station opening challenges and how can you control on other stakeholder 42
    • 3.3.2. Communication with Decision-Maker Stakeholders and other stakholder 44
    • 3.3.3 Project Resource Management 45
    • 3.3.3.1 Introduction to Personality Weaknesses and Behavior under Pressure:- I divided the 16 personality type into 4 groups from my practical life 48
    • 3.3.3.2 Identifying Fake Stakeholders in Your Organization;- 49
    • 3.3.3.3 Policy on Penalties for Career Advancement in Management to finish the activites smoothly and efficiently 51
    • 3.4 Chapter Summary 53
    • 1. Country Analysis for Contracting and Management Practices:- 55
    • 4.1 Corruption economic indicators 56
    • 4.2 The Power Related to the Funding Source 58
    • 4.3 Procurement Life Cycle 60
    • 4.3.1 Types of Procurement Strategies and Forecasting Tricks in Design,Implementation According to (type of procurement - type of tender-type of payment-owner entitey ) 61
    • 4.3.1.1. Traditional Method (Design-Bid-Build) 62
    • 3.4 Chapter Summary 65
    • 4.3.1.2 (design- build ) procurement and restricted tender and the method of payment lump-sum or value engineering 70
    • 4.3.1.3 The Ingratiation between (design- build -maintain-operation ) procurement and restricted tender and the method of payment lump-sum or value engineering , and in maintenance using KPI with unite price. 72
    • 4.3.1.4 :-Alliance Contracting:- 76
    • 4.3.1.5 PPP contract 81
    • 4.3.2.1.5.1 Are PPP Contracts Good or Not? 82
    • 1.3.1.5.2. advantages of Public Sector financial Support ppp contract : 87
    • 4.4 TENDERING TYPES 90
    • 4.4.1. Open Tender 90
    • 4.4.2 Restricted Tender 92
    • 4.4.3. Two-Stage Tender 94
    • 4.4.4 Framework Agreement 95
    • 4.4.5 Consequences of Selecting an Inappropriate Procurement Method and tender method on the life 96
    • Chapter 5 100
    • 5. Integrating Environmental Reports, Statistical Data, and Risk Feasibility Studies for Informed Decision-Making:- 100
    • 5.1 Fake Expert Engineers in Railway Engineering Overview 100
    • 5.1.1 Types of Fake Experts:- 101
    • 5.2 fesability study of railway project 102
    • 5.2.1 uncertainty in demand forcasting 103
    • 5.2.2 Uncertainty in Cost Prediction in Railways 111
    • 5.2.3 Factors in Choosing the Type of Railway Station (Elevated, Underground, At-Grade) 116
    • 5.2.4 Pre-Feasibility data Analysis of Corruption Index for countries , transportation policy , environmental data 120
    • 5.3 Source of funding and Feasibility Studies of rail way 122
    • 5.3.1 How Lenders and Investors Secure Their Interests and Authority in Project? 123
    • 5.3.1.1 Esclation equation explaintion 128
    • 5.3.1.1.1 Esclation equation in construction contracts :- 130
    • 5.3.2 Famouse Types of Construction Bonds needed in construction projects 132
    • Chapter 6 140
    • 6.1 Overview of the Design and Construction Process 140
    • 6.1.1 how the integration between Contract , Design integration , Quality Processes work and what is the famous gab could cost the owner a lot of money ? 140
    • 6.1.1.1 The contractor project manger’s will integrate that process along two phases 141
    • 6.1.1.2 Consultant and owner teams in design and constructution process in reviewing decuments 144
    • 6.1.1.3 Exploiting Weaknesses in the Owner’s or Consultant’s Organisational Structure — and How to Overcome This Gap 146
    • 6.2 Civil Defence and Technical Requirements: Saving Money in the Construction Design Process 147
    • 6.2.1 Civil Defense Sector 148
    • 6.2.1.1 Approaches to Saving Money in Construction 149
    • 6.2.1.1.1 The Detrimental Approach 149
    • 6.2.1.1.2 The Recommended Approach:- 150
    • 6.2.2 Benefits of knowladge Aspects Through Understanding the Purpose of Technical Rooms and unused places in operation process in Railway Projects in: Planning, Design,Implementation and operation Considerations from Civil Defense Reports 158
    • 6.3 the hardness of Navigating Cost Management and Responsibility in Railway Project Drawings: Balancing Design, impelmentation ,quality Obligations and Financial Strategies 161
    • 6.3.1 how to apply some ideas about saving money in sectors Engineering 163
    • 6.3.1.1 ideas in designing of types of railway stations(elevated under ground or under ground…) 163
    • 6.3.1.2 The risk High project specifications more than country specification in useless activities :- 166
    • 6.3.2.3 potential confelect in designing railway alignment with utilities and traffic division,land acquisition 167
    • 6.3.2.4 Overcoming thefts on-site during implementation and operationMobilization:- 169
    • 6.4 Chapter Summary 172
    • Chapter 7 175
    • 7.1 Negotiation 175
    • 7.1.1 Contract Administration to Avoid Arbitration , Risk Management or to gain the negotiations. 176
    • 7.1.2 Negotiation doesn’t always need to occur in formal meetings 181
    • 7.2 claim prediction 182
    • 7.2.1 the types of risks and claims in railway project that may arise:- 183
    • 7.2.2 Predicted Risk of Claims in Railway Projects According to the Organization 188
    • 7.2.3 Steps to Predict Future Claims and Potential Additional Costs against the client The following steps outline the process:- 188
    • 7.2.4 Steps to Predict Future Claims and Potential Additional Costs against the contractor 192
    • 6.3 famous gaps in planning and cost analysis related to claims 196
    • 7.4 Chapter Summary 198
    • Conclusion 200
    더보기

    분석정보

    View

    상세정보조회

    0

    Usage

    원문다운로드

    0

    대출신청

    0

    복사신청

    0

    EDDS신청

    0

    동일 주제 내 활용도 TOP

    더보기

    주제

    연도별 연구동향

    연도별 활용동향

    연관논문

    연구자 네트워크맵

    공동연구자 (7)

    유사연구자 (20) 활용도상위20명

    이 자료와 함께 이용한 RISS 자료

    나만을 위한 추천자료

    해외이동버튼