RISS 학술연구정보서비스

검색

인기 검색어

    다국어 입력

    http://chineseinput.net/에서 pinyin(병음)방식으로 중국어를 변환할 수 있습니다.

    변환된 중국어를 복사하여 사용하시면 됩니다.

    예시)
    • 中文 을 입력하시려면 zhongwen을 입력하시고 space를누르시면됩니다.
    • 北京 을 입력하시려면 beijing을 입력하시고 space를 누르시면 됩니다.
    닫기

    Optimizing Railway Development Funding through Transit-Oriented Development (TOD): A Case Study of the Jakarta LRT Loopline, Indonesia

    한글로보기

    https://www.riss.kr/link?id=T17415843

    • 0

      상세조회
    • 0

      다운로드
    서지정보 열기
    • 내보내기
    • 내책장담기
    • 공유하기
    • 오류접수
    인용문이 복사되었습니다.

    부가정보

    다국어 초록 (Multilingual Abstract) kakao i 다국어 번역

    Jakarta's expansion of rail-based public transit systems is limited by severe congestion, environmental challenges, and fiscal constraints. Even though a new rail project is economically feasible, it is financially unviable.

    Jakarta's expansion of rail-based public transit systems is limited by severe congestion, environmental challenges, and fiscal constraints. Even though a new rail project is economically feasible, it is financially unviable.

    더보기

    목차 (Table of Contents)

    • TABLE OF CONTENTS
    • 1 INTRODUCTION 1
    • 1.1 Background of Study 1
    • 1.2 Problem Statement 3
    • TABLE OF CONTENTS
    • 1 INTRODUCTION 1
    • 1.1 Background of Study 1
    • 1.2 Problem Statement 3
    • 1.3 Research Objectives 3
    • 1.4 Research Question 4
    • 1.5 Limitation of Research 4
    • 1.6 Significance of Study 5
    • 1.7 Thesis Structure 6
    • 2 LITERATURE REVIEW 8
    • 2.1 Transit Oriented Development 8
    • 2.1.1 Definition of Transit Oriented Development 8
    • 2.1.2 Typology of Transit Oriented Development 10
    • 2.2 Implementation of Transit Oriented Development 12
    • 2.2.1 TOD Implementation in Develop Countries 13
    • 2.2.2 TOD Implementation in Developing Countries 17
    • 2.2.3 Lessons Learned and Critical Successs Factors 20
    • 2.3 Land Value Capture 20
    • 2.3.1 Concept and Mechanism of LVC 21
    • 2.3.2 Key Success Factors and Risk of LVC 22
    • 2.3.3 Applicability to Railway Development 23
    • 3 METHODOLOGY 24
    • 3.1 Research Design 24
    • 3.2 Data Collection 24
    • 3.3 Case Study 25
    • 3.3.1 Determining the Case Study 25
    • 3.3.2 TOD Location Analyzed 26
    • 3.4 Data Analysis 27
    • 3.4.1 Demand Scenarios 27
    • 3.4.2 Financial Model 28
    • 3.4.3 Comparative Evaluation of TOD Impacts 29
    • 3.5 Dependability, Validity, and Limitation 29
    • 3.5.1 Dependability 29
    • 3.5.2 Validity 30
    • 3.5.3 Limitation 30
    • 4 CASE STUDY AND ANALYSIS 31
    • 4.1 General Overview 31
    • 4.2 Model Business Assumption 35
    • 4.3 Demand Scenarios 37
    • 4.4 Financial Model 41
    • 4.5 Capital Expenditure (CAPEX) 42
    • 4.6 Operation Expenditure (OPEX) 45
    • 4.7 Replacement Expenditure (REPEX) 47
    • 4.8 Traffic Matrix 48
    • 4.9 Non Farebox 52
    • 4.9.1 OPEX for Non Farebox 52
    • 4.9.2 Non-Farebox Revenue 53
    • 4.10 Estimated TOD Cost 54
    • 4.11 Capital Expenditure (CAPEX) for TOD 55
    • 4.12 Operation Expenditure (OPEX) for TOD 56
    • 4.13 Estimated Revenue for TOD 58
    • 4.14 Internal Rate of Return (IRR) 60
    • 5 CONCLUSION AND RECOMENDATION 63
    • 5.1 Conclusion 63
    • 5.2 Recommendation 65
    • 5.2.1 Focus on the most financially beneficial TOD Nodes 65
    • 5.2.2 Incorporate TOD Revenue in Structuring for PPP To Encourage Private Participation 65
    • 5.2.3 Data Collection and Monitoring Framework Improvement 66
    • 5.2.4 Recommendations on Further Research 66
    • REFERENCES 67
    더보기

    분석정보

    View

    상세정보조회

    0

    Usage

    원문다운로드

    0

    대출신청

    0

    복사신청

    0

    EDDS신청

    0

    동일 주제 내 활용도 TOP

    더보기

    주제

    연도별 연구동향

    연도별 활용동향

    연관논문

    연구자 네트워크맵

    공동연구자 (7)

    유사연구자 (20) 활용도상위20명

    이 자료와 함께 이용한 RISS 자료

    나만을 위한 추천자료

    해외이동버튼