The Kyrgyzstan Republic is a mountainous country and about 90 % of the territory covered by mountains. Kyrgyzstan government want to build more -auto and – railway road for increasing economics value, so as noticed that 90 % of Kyrgyzstan territory ...
The Kyrgyzstan Republic is a mountainous country and about 90 % of the territory covered by mountains. Kyrgyzstan government want to build more -auto and – railway road for increasing economics value, so as noticed that 90 % of Kyrgyzstan territory is mountains it is obviously that it is necessary to design and onstruct new tunnel.
This master thesis is dealing with tunneling over excavation problem, with minimizing over excavation for drilling and blasting operations in the construction of railway tunnels and the existing chances and problems especially occurring in the estimation of the number of holes and quantity of explosives during operations. Indeed, when carrying out blasting in tunnels, it is necessary to ensure maximum compliance with the actual cross-section development project. During normal blasting, when the charges. The explosives of all the holes in the face and the distances between them are the same, deviations of the obtained output circuit from object with the formation of so-called brute force. Brute force distorts the shape of the output, increase the volume of work on the work of the rock and its removal from the bottom, lead to an increase in concrete consumption (up to 50–80%) due to the need to fill the voids beyond the design output circuit. In addition, during normal blasting, a strong seismic effect of the explosion on the rock mass around the tunnel is manifested, which leads to a violation of its continuity and the occurrence of many cracks.